Several posts have to be removed. Each post is buried d[m] in the ground anw will require a maximun vertical pulling force f[N] to remove it.
the worker can use his truck to develop the force, but he needs to devise a method for their removal without beaking the posts
Design a method that can be used, considering that the only material available is a strong rope and several pieces of wood having various sizes and lenghts.
Submit a draiwng of your design and discuss the safety and reliability of its use.
Provide a force analysis to show how it works and why it will cause no/minimal damage to a post whenit is removed.
Force analysis are to be given in three forms algebraic,graphicaland matrix.
Can some one help me out on this