pig launcher and reducer

06/28/2011 8:30 AM

Please want to know the basic steps involved in the design of a pig launcher and reducer.

Thanks.

Charles(Nigeria)

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

Good Answers:

These comments received enough positive votes to make them "good answers".
Anonymous Poster #1
#1

Re: pig launcher and reducer

06/28/2011 8:42 AM
Register to Reply
Guru

Join Date: Jul 2008
Location: Anywhere I may be at the time
Posts: 661
Good Answers: 16
#2

Re: pig launcher and reducer

06/28/2011 11:36 AM

Please check the below link, it should answer some of your questions

http://www.control.com/thread/1026236445

Register to Reply
2
Guru

Join Date: Jan 2010
Location: Mineral wells Tx
Posts: 630
Good Answers: 34
#3

Re: pig launcher and reducer

06/28/2011 11:44 AM

GOOGLE?????? Again

Pig Launching & Receiving
Procedures

Pig launchers are used to launch the pig into the pipeline, and pig receivers are used to receive the pigs after they have made a successful run. The choice of these pig traps will depend on the type of pig to be run and pipeline design conditions. Provisions in the station design should include handling equipment for pigs 20" and larger. Caution should be taken for liquid spillage from the pig traps.

Typical Pig Launching Procedures

The operational sequence described below is for general information only. It is not intended, nor should it be used, to train pigging system operators. Operating procedures will vary from one pipeline company to another. The following pig launching procedures can be used as a guideline for developing operating procedures.

Since company policies vary regarding whether the pig launcher is left on stream or isolated from the pipeline after the pig is launched, the operator should verify that the trap is isolated from the pipeline and depressurized before commencing any part of the launch procedure.

  1. Make sure that the isolation valve and the kicker valve are closed.
  2. In liquid systems, open the drain valve and allow air to displace the liquid by opening the vent valve. In natural gas systems, open the vent and vent the launcher to atmospheric pressure.
  3. When the pig launcher is completely drained (0 psig), with the vent and drain valves still open, open the trap (quick opening closure) door.
  4. Install the pig with the nose firmly in contact with the reducer between the barrel and the nominal bore section of the launcher.
  5. Clean the closure seal and other sealing surfaces, lubricate if necessary, and close and secure the closure door.
  6. Close the drain valve. Slowly fill the trap by gradually opening the kicker valve and venting through the vent valve.
  7. When filling is complete, close the vent valve to allow pressure to equalize across the isolation valve.
  8. Open the isolation valve. The pig is ready for launching.
  9. Partially close the main line valve. This will increase the flow through the kicker valve and behind the pig. Continue to close the main line valve until the pig leaves the trap into the main line as indicated by the pig signaler.
  10. After the pig leaves the trap and enters the main line, fully open the main line valve. Close the isolation valve and the kicker valve.
  11. The pig launching is complete.

Typical Pig Receiving Procedures

The operational sequence described below is for general information only. It is not intended, nor should it be used, to train pigging system operators. Operating procedures will vary from one pipeline company to another. The following pig receiving procedures can be used as a guideline for developing operating procedures.

Since company policies vary regarding whether the pig receiver is left on stream or isolated from the pipeline, the operator should verify whether there is any internal pressure in the receiving trap before starting any part of the receiving procedures.

  1. Make sure the receiver is pressurized.
  2. Fully open the bypass valve.
  3. Fully open the isolation valve and partially close the main line valve.
  4. Monitor the pig signaler for pig arrival.
  5. Close the isolation valve and bypass valve.
  6. Open the drain valve and the vent valve.
  7. Check the pressure gauge on the receiver to assure the trap is depressurized (0 psi).
  8. Open the trap closure and remove the pig from the receiver.
  9. Clean the closure seal and other sealing surfaces, lubricate if necessary, and close and secure the trap (quick opening closure) door.
  10. Return the receiver to the original condition.

Standard Pig Launcher / Receiver

Register to Reply Good Answer (Score 2)
Guru
New Zealand - Member - Kiwi Popular Science - Weaponology - New Member Engineering Fields - Power Engineering - New Member Engineering Fields - Electrical Engineering - New Member

Join Date: Sep 2006
Location: Auckland, New Zealand
Posts: 8777
Good Answers: 376
#4

Re: pig launcher and reducer

06/28/2011 3:18 PM

Having at least one advanced qualification recognised by the petrochemical industry is generally necessary also if this is more than just a general interest or homework question.

For some reason employers and design consultants seem to want their system and maintenance designers to be qualified.

__________________
jack of all trades
Register to Reply
Active Contributor

Join Date: Nov 2008
Posts: 23
#5

Re: pig launcher and reducer

07/01/2011 7:03 AM

The design of a pig luncher or receiver involves,

a) A good knowledge of the ASME Codes in particular ASME Sec VIII div 1, ASME B31.4 and B31.8. and B31.3

You need the above knowledge to be able to do the following

Wall thickness calculations for the major barrel, minor barrel, the reducer and the End cover.

Other cal calculations of reinforcement of nozzle opening are also necessary.

Support saddle calculations are also required.

b) However before you can commence the calcolations you need to get the process parameters of pressure, temperature, density, viscosity, etc of you process fluid;gas or liquid.

You may wish to contact me on <removed email> for a detailed design calculation note on this.

Chike

CR4 Admin - email address removed

From the CR4 Rules: Do not post phone numbers or email addresses. The CR4 Admin will delete all phone numbers posted in threads or comments, and we strongly urge you not to put up email addresses. You can share this information via the CR4 internal messaging system.

Register to Reply
Register to Reply 5 comments

Good Answers:

These comments received enough positive votes to make them "good answers".
Copy to Clipboard

Users who posted comments:

Anonymous Poster (1); Chike Nwachukwu (1); jack of all trades (1); Tim in Mexico (1); Whitephone (1)

Previous in Forum: Pipe schedule for Socketweld Flange   Next in Forum: What is the best type of Flowmeter for RTRP Lines

Advertisement