Close
Close
3 comments
Comments: Nested

Engineering360: "Hornsea 2 delivers first power"

12/22/2021 1:40 PM

Read Engineering360 article: Hornsea 2 delivers first power.

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
Engineering Fields - Nuclear Engineering - New Member

Join Date: Sep 2009
Location: Louisville, OH
Posts: 1926
Good Answers: 36
#1

Re: Hornsea 2 delivers first power

12/23/2021 11:28 PM

Is 8 MW the installed power? What is the expected actual power? Maybe one-third of this?

__________________
Lehman57
Register to Reply
Anonymous Poster #1
#2
In reply to #1

Re: Hornsea 2 delivers first power

12/24/2021 7:06 AM

When fully operational, the wind farm will be capable of generating 1.32 GW.

Register to Reply
Guru
Engineering Fields - Nuclear Engineering - New Member

Join Date: Sep 2009
Location: Louisville, OH
Posts: 1926
Good Answers: 36
#3
In reply to #2

Re: Hornsea 2 delivers first power

12/24/2021 2:42 PM

Since 8 MW x 165 turbines = 1.32 GW, that is the installed capacity, but NOT what will actually be generated, which will be approximately 1/3 of that.

__________________
Lehman57
Register to Reply
Register to Reply 3 comments

Advertisement