Electronics360: "Advanced nuclear has what AI data centers need. Can it arrive in time?"

09/05/2026 8:11 AM

Read Electronics360 article: Advanced nuclear has what AI data centers need. Can it arrive in time?.

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
Engineering Fields - Nuclear Engineering - New Member

Join Date: Sep 2009
Location: Louisville, OH
Posts: 1945
Good Answers: 36
#1

Re: Advanced nuclear has what AI data centers need. Can it arrive in time?

09/05/2026 11:33 PM

Nice summary, but I think the word "advanced" is used too loosely. Does it means Gen III reactors using advanced technology? Or does it mean Gen IV (fast) reactors using a quite different technology? I vote for using "advanced" only for fast reactors. They are much more efficient in uranium use, because they can fission both U-235 and U-238. U-235 is .71% of natural uranium. They have less waste because of using the U-238 portion (99.3%), and the waste is less radioactive for fewer years because the fast reactors also use the highly radioactive components to make energy.

__________________
Lehman57
Register to Reply
Participant

Join Date: Sep 2026
Posts: 1
#2

Re: Advanced nuclear has what AI data centers need. Can it arrive in time?

09/10/2026 10:51 AM

I believe that if the Advanced Nuclear Stations can produce high temperatures, they can be used to produce Hydrogen from water or at least the first phase of the process. Once the right materials are found and produced, the Hydrogen could be competitive and very important to reduce the pollution worldwide.

Register to Reply
Guru
Engineering Fields - Nuclear Engineering - New Member

Join Date: Sep 2009
Location: Louisville, OH
Posts: 1945
Good Answers: 36
#3

Re: Advanced nuclear has what AI data centers need. Can it arrive in time?

09/10/2026 1:09 PM

The cost and time are huge in the public's mind. There are 2 major components of each.

The cost and time to actually build the reactor will be substantially reduced as we standardize; that is, build more than one of a kind (FOAK.)

The cost and time to counter the lawsuits, protests, & regulation/permitting are an even greater problem in my opinion. All take much longer than they should, and lawsuits can delay the project by years and, of course, increase the costs. This is where we have to spend our greatest effort. If a design is safe and permitted in Europe, why can it not be automatically approved here? Lawsuits may be best handled by better and more education to not just the adults but also those still in the educational system.

__________________
Lehman57
Register to Reply
Register to Reply 3 comments

Advertisement