Major Highlights§ Recognized as Principal Point of Contact for Project Succession and delivery. § Established Best practices in Preventive Maintenance with timely resolve of break-downs with emphasis to achieve 90% uptime of optimal plant and Critical Equipment Availability. § Analyzed, Validated Electrical plans in conformance to standards and to conduct fault current safely. § Headed Quality Inspection & Acceptance testing. Focused to Technical Integrity and RoHS compliant. § Slashed Manual Operators Positions by leading innovative Automations in Production Areas. § Acknowledged as Expert to deal with issues logged in Technology Service Desk with >90% resolve. § Demonstrate Verifiable Command and Exceeded Cashable Savings in Resource Assessment &Techno-Economical Procurement. Played key role in intensive negotiation collectively achieved >15% savings. § Grew revenue saving by FOC replacement against Warrantee Claims. Settled 1200 Nos. DPR CT Claim. § Successfully lead approvals for CEIG, PTCC and Liasioning other Government bodies. § Participate in Developing Community Relationship and CSR activities. § Affiliations to International Solar Energy Society (ISES). § Practiced stringent statutory regulations on safety and HAZOP. Identify risks and mitigation plans. Professional ExperienceAlfa Infra Prop Pvt. Ltd Sr. Manager O&M Aug -15 to PresentMumbaiSpearhead Upcoming Megawatt basis grid connected Solar Power Plant Projects Nationwide. Charge with Team Lead for Installations, Testing and Commissioning. Technical Direction for HT-Yard Maintenance protocol and Power Evacuation of the existing plants having fixed tables and Single Axis Tracker system. Engagements to Scrutinize Technical Offers for Solar Inverters, PV Modules, Power Transformers, Cables and other Major Components with design review. Authorize for Certifications of invoice and BOQ with Material Reconciliations. Analyze Trend Monitoring and Energy Generation Performance. Selected Accomplishments§ Lead Independently Site Installations. Maintained Key Relationships with Vendors and Clients. § Developed Technical Specifications & Maintenance Modules for Major Power Components. § Recruitment, Training and groom high-potential subordinates at site level. Birla Surya Ltd. AGM Electrical Sept -11 to –Aug-15PunePlanning, Scheduling, Executions for 300 MWp Manufacturing Capacities EPC Project for Solar Cell, Wafer and Modules. Estimated Project cost 2300 crores. Handled key engineering initiatives and start-up operations. Managed CAPEX of 200 Crores with internal projections and strategizing with spiraling cost. Operational Highlights§ Engagement Right from Conception, Counseled Site Selection and Land Acquisition. § Explored Harmonic Suppression to avoid Power Glitches in PV manufacturing with EMI & EMC issues. § Orchestrated work at site as per GFC and Shop-floor drawings. Arranged field tests, Mock-up display. § Headed Regulatory Audits of Agencies of industrial standards with Closer of Non- Conformity. § Initiated and facilitated departmental synergy meetings for the effective communication. § Design Review for 2 MW Roof Top Power plant at Manufacturing Plant. Selected Accomplishments§ Developed and implemented several Value Stream Mapping initiatives. § Suggested and incorporated design change in Transformer’s tap changer for fail-safe operation. § Awarded first prize in Safety Slogan Competition organized by L&T construction at project site. Suzlon Energy Ltd. Deputy Manager Nov -07 to Sep -11 Pune Handled Nationwide Technical services for WTG Operations and Maintenance with Trouble-shoot, RCA and repairing. Key Result Area related to Production, Development, Testing, Installation and Commissioning of Wind Turbines. Enforce Corrective measures to improve MTBF with Performance Guarantee. Operational Highlights§ Supported for Fleet availability above 97% with Expert counsel for clarification of field NCR. § Established Grid discipline with Reactive Power, Line Loss, Current Asymmetry and Generation Analysis. § Charged as SPOC for the Failure Notification from SBU. Negotiated repairing Quotations and Reduction of rejections at Pre-inspections. § Recommended, Executed retro-commissioning and Incremental design improvement for WTG Health. Conducted Trials for alternative under-budget reliable component. Reviewed functionality in pilot run. § Exceeded Operational Excellence in WTG with PFMEA Tool. Followed discrepancies in Validation. § Worked in SAP system for Capital Item Procurement, Planning and Maintenance Process. § Engagement with Project Team to successfully erect > 50 No’s (~ 75 MW) Wind Turbine Generators at Suzlon Sites. Activities involved Technical support for start-up, testing and system commissioning. Selected Accomplishments§ Analyzed wind turbines utilizing Suzlon softwares. Conceived valid resolution within lead time. § Delivered Modification in PCVCB trip circuit for reliable tripping appreciated from Crompton Greaves. § Concluded PWI for Standard Maintenance being used for all sites of Suzlon recognized as helping tool. Saurashtra Chemicals Ltd. Sr. Plant Superintendent Feb -95 to Oct -07 Porbandar Served independently as Shift Incharge Responsible 24x7 for all the Electrical & Instrumentation Engineering aspects for the continuous process heavy Chemical plant related to Projects, Operation and Maintenance for achieving production target of 1200 Tons per day of Soda-Ash with Bi-Products. Proven Experience for managing wide spectrum of machinery and utilities with Tactical Solutions. Operational Highlights§ Accountable for Uninterrupted power supply as process requirement. Controlled Electrical Sub-Station. § Specialist in Maintenance and Selection of LT/HT Induction Motors. Guided Workshop Operation for Motor Mechanical Repairing, Assembly and Testing. Coordinating Condition monitoring through NDT. § Proficiencies to handle complex Interlocked Circuits. Logic solving for process Automations and Drives. § Expertise in Operation and Maintenance of Vertical Lime Kiln Bucket Hoist (25T/Hour), Rotary Lime Kiln and Calciners, Ball-Mill with Material Handling and discharge Systems. § Exposure to Maintenance of Auxiliaries, CHP and AHP in 3X10 MW Coal Based Captive Power Plant. § Member of Energy conservation cell. Conducted Audits to draw action plan for Cost Optimization. Selected Accomplishments§ Promoted to Senior Plant Superintendent. § Contract maximum demand rationalization, resulting in 20% Demand reduction. § Increased inventory Accuracy from 50% to 90 by coordinating Renovation of old circuits. Indo Zinc Limited Electrical Engineer Aug -93 to Feb -95 Pithampur Operational Highlights & Accomplishments§ Accountable for Maintenance and troubleshooting. Upgraded the existing system in phased manner. § Commissioned 750KVA DG Sets for Stand-by Power requirement. Plant Power Factor Improvement Universal Transformers Electrical Engineer May -92 to July-93 Indore Operational Highlights & Accomplishments§ Responsible for all activities required for Control Transformers Production, Testing and Certifications. § Reduction in Rejection. Designed 20% more efficient and cost effective Transformers. Professional Development§ Excellence in Supervision Organized by Baroda Productivity Council. § Workshop on Switch-Gears Conducted by L&T § Essential of Project Management & Negotiation skill § PFMEA implementation in WTG Operation & Maintenance ScholasticsBachelor of Electrical Engineering, First Division, from Government Engineering College Bilaspur (M.P.) Year 1991 Personal DossierDate of Birth 22nd Sept 65 Hobbies & Activities Cooking, Reading, Antique & Book collections, Repairing, Gardening, Handy-Crafts, Visit to Exhibitions. Regular reader For Global -Spec -CR4 thread & PV Tec Advertisement
|
Advertisement
|
|||||||||||||||||||||||||||||||||||||||||||||||||||