· To execute construction activities as per P&ID, and Instrument Location plan, and project drawings, Etc.

· Complete knowledge of Saudi Aramco standards for electrical and instrumentation.

· Submission of Technical queries, proposals for variation in drawings and execute the work according to the reply.

· Installation and commissioning of Truck loading and unloading modules.

· Installation and testing of ROTORK MOV master station and MOV, ZV, FCV's.

· Coordinate with DCS vendor and Terminal management systems for up gradation of Dcs and ESD systems.

· Installation and testing of fire alarm system pyrotronics (Cerberus- system3 CP35) & field devices such as heat detector, smoke detector.

· Installation and testing of fire alarm and manual call station, Beacon & Horn, Deluge valve etc.

· Installation and testing of cathotic protection & grounding systems.

· Installation, Erection and commissioning of all instrument systems like transmitters, Level switches, DP switches, control valves, Cable tray, cable laying, Junction boxes.

· In charge of Loop checking (Hot & Cold), functional test, interlock logic check, Fire drill, Plant ESD, etc.

· Preparation of Documents like Loop folders, loop packages, as built ect.