NDT after PWHT.

08/23/2007 2:02 AM

Dear All,

Pipe spool fabrication base on Code and standards B31.3.

Everyone can give to me advice ?

MT after PWHT shall be done or not necessary ?

Thanks and Best Regards,

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru

Join Date: Sep 2006
Location: Western Pennsylvania, USA
Posts: 761
Good Answers: 9
#1

Re: NDT after PWHT.

08/24/2007 8:00 AM

First, NDT was performed pre PWHT, even if only VT, probably even Surface or usually some Volumetric Test. Point, does PWHT change chemistry or molecular structure of weld and parent metal? I have found that it does and after 30 years of B.31, I suggest NDT gets performed after PWHT to ensure integrity.

Reply
Anonymous Poster
#2
In reply to #1

Re: NDT after PWHT.

08/24/2007 11:48 PM

Hi Ser,

Thanks a lot for your support. our pipe 400 mm sch 120 material A333 Gr.6 welding to pipe A333 Gr.6. PWHT only for welding joint base on ASME B31.3.

Thanks and Best Regards,

Reply
Guru

Join Date: Sep 2006
Location: Western Pennsylvania, USA
Posts: 761
Good Answers: 9
#3
In reply to #2

Re: NDT after PWHT.

08/25/2007 9:34 AM

You are welcome!!