Cutting a Slab for a Run of Pipe

06/26/2006 9:55 AM

Roman writes:
Hi,
Can anybody give me answer on my question? I need to cut the existing slab on which a building sits, to run an air con drain pipe. The thickness of the slab is 100mm and the total cut was 50mm depth by 50mm wide. Is this allowable based on your experience and building codes?

__________________
Off to take on other challenges. Good luck everybody! See you around the Interwebs.
Register to Reply
Pathfinder Tags: pipe cutting piping
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Anonymous Poster
#1

slab cutting

06/26/2006 1:52 PM

in general you'll repour concrete to fill in the pipe run. If it's a standard 1 story residential slab then you shouldn't have a problem. Of course, the ulitmate aribrator is your local building department; I'd go ask them when you get your permit. You'd also better beware of any other (water, sewer, etc) pipes in the slab.

Register to Reply
Member

Join Date: Jul 2006
Posts: 5
#3
In reply to #1

Re:slab cutting

07/27/2006 9:35 AM

If it's in case that the slab you're going to cut, it's roof slab then you must be aware of the decay of reinforcing bar of concrete after cutting of 50mm depth (Because of your concrete slab 100mm thickness) regardless of re-concreting and waterproofing after then Hope it will help Tommy Vietnam

Register to Reply
Power-User

Join Date: Nov 2005
Posts: 101
Good Answers: 9
#2

Cutting slab for run of pipe

06/27/2006 12:35 PM

I generally agree with the first response. I would be cautious if the slab spans any opening such as a crawl space or basement. I would reveiw what the slab may be supporting other than occupancy items. However, if the slab is not spanning any open space you are probably okay. But always get the local building inspector buy-in. Showing him two opinions from an engineering bulletin board isn't going to protect your backside.

Register to Reply
Register to Reply 3 comments
Copy to Clipboard

Users who posted comments:

Anonymous Poster (1); ccoop610 (1); TommyofVN (1)

Previous in Forum: Part 1: A Giant Nationwide Engineering Project   Next in Forum: The Eisenhower Interstate Highway System: The Politics of Passage

Advertisement