Dear Sir
We are one of the leading manufactires of VRLA Batteries. In finishing we need to fill the gap(half circle in shape) around the post with some solution, which need to be dried in 3 hours and must able with stnad in solid condition at 70 degrees centigrade temparature.
"Almost" Good Answers: