I did came across a project with following:-
A U Stamped vessel already of 5 years of service life.Now we have just fabricate the shell & Bottom dish whereas the top dish will be cut from older vessel and to be welded to newly fabricated equipment.
Design pressure is 70 kg/cm2 ,MOC SA 516M Grade 485(70)
Shell 63 thk,bot.dish 75 thk.
The work does not requires any approved u stamping nor it is to be carried as per R stamp
My query:-1)After fabrication of complete vessel ,new with old top dish it is to be hydrotested.now can we keep hydrostatic test pressure same as per CODE ASME UG99 b,or is there any clause in code which allows to use lesser pressure,if not then suggest in this condiiton what would be ideal hydrostatic test pressure.
2)All weldings to pressure parts to be post weld heat treated as per the design code requirements,however for the welding of shell to top dish circumferential joint while PWHT top dish which is older part will also see the temp of PWHT thus can this produce an adverse affect on the top dish properties.
"Almost" Good Answers: