Induction Field From 110-KV Grid

07/01/2008 11:19 AM
110kv grid is already laid and a building is being constructed under the grid

Grid is 27 meter above ground level and building will be 17 meter high.

So building will be 10 meter away from grid.

What is regulation in this connection ? what is safe distance recommended ?

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
United Kingdom - Member - New Member Hobbies - Musician - New Member Engineering Fields - Mechanical Engineering - New Member Hobbies - Target Shooting - New Member Engineering Fields - Power Engineering - New Member Hobbies - Fishing - New Member

Join Date: Mar 2007
Location: South-east corner of Spain 50 48 49.24N 2 28 27.70W
Posts: 1508
Good Answers: 31
#1

Re: Induction Field From 110-KV Grid

07/01/2008 3:21 PM

I would advise you to check out the local regs or enquire at the planning office! The building sounds quite close but it all depends what the people of the board say! Remember, it's not only the building that needs the recommended distances but also the construction equipment like the cranes!

__________________
“It's kind of fun to do the impossible.” Walt Disney
Register to Reply
Guru

Join Date: Dec 2005
Posts: 1602
Good Answers: 19
#2

Re: Induction Field From 110-KV Grid

07/02/2008 2:26 PM

Usually the owner of the grid will have an easment under the grid that will prohibit permanent structures under the grid. Check for property easements, and whether you have the right to construct the building under the utility.

__________________
Eventually, one needs to realize that it is far less important to be the smartest person in the room than it is to sit next to that person and make friends.
Register to Reply
Active Contributor

Join Date: Sep 2007
Posts: 13
#3

Re: Induction Field From 110-KV Grid

07/04/2008 4:23 PM

to me, i would recomend the owner of building and the construction engr. for psychiatry test if they are building a permanent structure of that hieght under 110KV grid. local autority must be informed.

Register to Reply
Register to Reply 3 comments
Copy to Clipboard

Users who posted comments:

kadex (1); Mr. Truman Brain (1); Ried (1)

Previous in Forum: Why Are Ammeters Connected in Yellow-Phase Only?   Next in Forum: Dimmers on Low-Voltage Halogen Bulbs

Advertisement