As per IEC standards for what ratings of Pump,Conveyors or any other motors should have Ammeters at Locol control post or at Main feedres ? and what is the number of that standard ?
Do not know of any national standard that requires metering to fitted on any of this type of plant. Cannot see personally why there should be such a standard. Customers usually know what they want.
__________________
A day without a smile is a day lost
"Almost" Good Answers: