Please anyone tell me what are the factors to considered in drawing hook-ups, such as Pressure piping/tubing hook-ups, Air piping/tubing Hook-ups, Wiring Hook-ups, Steam Trace hook-ups and Analyzer hook-ups? Also, please specify what reference drawing I shall use. I will draw this from scratch.