Hydrostatic Test Requirements

08/28/2009 11:20 AM

Dear guys,

we conduct hydro-test on 10'' line(gas);at the completion of the test, 3rd party inspector refused to signed off the test report instead he was asking for the metal temperature and hydrotest water temperature which was not in our test procedure.

My question is , is it a standard requirement? and if the answer is yes, what is the stds for a temperature safety margin between MDMT and hydrotest water temperature?

Also is there any relationship between stresses and hold times during hydro static test?

i have alway appreciate your response.

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

Good Answers:

These comments received enough positive votes to make them "good answers".
Commentator

Join Date: May 2008
Location: New Delhi, India
Posts: 91
Good Answers: 1
#1

Re: Hydrostatic Test Requirements

08/29/2009 1:24 AM

Hi..

What was the test requirement? was it an elevated temprature test? what is the gas pipeline suppossed to convey..i mean which type of gas?

I have conducted hydro tests on several types of air & gas lines viz oxygen, acetelyne, coke-oven gas & BF gas (these are very rich in CO), nitroge, NH3 etc. Everywhere, the test requirements was for tests to be conducted at normal temprature. We usually held the test pressure for 5-minutes and then reduced it to max design pressure. After this all joints were subjected to 100% visual exam for any leakage, sweating etc. Our third party inspectors included those from LIRIS & BVQI.

Anil Tiwari / New Delhi

__________________
Anil Tiwari
Reply
5
Guru
Engineering Fields - Piping Design Engineering - New Member Egypt - Member - Member since 02/18/2007

Join Date: Feb 2007
Location: Cairo, Egypt
Posts: 1733
Good Answers: 248
#2

Re: Hydrostatic Test Requirements

08/29/2009 7:45 AM

At first, you have to define the code used in design and construction of your piping system, I mean, did you used ASME Process Piping Code, B31.3 or Gas Transmission and Distribution Piping System, B31.8.

I think that the 3rd party inspector is afraid of doing the hydrotest at ambient temperature which may cause the pipe skin temperature to be lower than the MDMT of the whole piping system. If that is the problem, I like to declare that no way to allow for your piping system to operate or tested at temperatures lower than its MDMT.

So, the 3rd party inspector have the right to verify if the system subjected to that case or not. And the Form of Hydrostatic Test Procedure must contain a record for these temperatures.

Notes:

1. If there there is no statement in the contract of the project to proceed a hydrostatic test (by water or another liquid), the ASME codes states that gas pipelines can be pneumatically tested (by air or gas) in lieu of hydrostatic test by the conditions and details specified by the code.

2. The relation between design pressure Pd and hydrostatic test pressure Ph for a piping system designed and constructed as per ASME B31.3 is: Ph = 1.5 Pd (Sat ambient temp. / Sat design temp.). But if your piping system is designed and constructed in accordance with ASME B31.8, the relation between test pressure and design pressure is as indicated in Table 841.322(f).

3. For more understanding to MDMT, see the following CR4 Threads: Minimum Design Metal Temperature (MDMT) & Impact Test.

4. Relation between Stresses and holding time: The following article is extracted from Pressure Piping code B31.8, Gas Transmission and Distribution Piping System, Para. 841.32 (Edition 1995):

Quoted

Para. 841.321 All pipelines and mains to be operated at a hoop stress of 30% or more of the SMYS of the pipe shall be given a test for at least 2 hours to prove strength after construction and before being placed in operation.

Para. 841.322

(a) Pipelines located in Location Class 1 Division 1 shall be tested hydrostatically to 1.25 times design pressure if the max. operating pressure is greater than 72% SMYS.

(b) Pipelines located in Location Class 1 Division 2 shall be tested either with air or gas to 1.1 times the max. operating pressure or hydrostatically to at least 1.1 times the max. operating pressure if the max. operating pressure is 72% SMYS or less.

(c) Pipelines and mains in Location Class 2 shall be tested either with air to 1.25 times the max. operating pressure or hydrostatically to at least 1.25 times the max. operating pressure.

(d) Pipelines and mains in Location Class 3 and 4 shall be tested hydrostatically to a pressure not less than 1.4 times the max. operating pressure. This requirement doesn't apply if, at the time the pipeline or main is first ready for test, one or both of the following conditions exist

(1) the ground temp. at pipe depth is 32 oF or less, or might fall to that temp. before the hydrostatic test could be completed, or

(2) water of satisfactory quality is not available in sufficient quantity.

In such cases an air test to 1.1 times the max. operating pressure shall be made, and the limitations on operating pressure imposed by Table 841.322(f) do not apply.

(e) The test requirements given in Para. 841.322(a), (b), (c), and (d) are summarized in Table 841.322(f).

(f) In selecting the test level, the designer or operating company should be aware of the provisions of Para. 854 and the relationship between test pressure and operating pressure when the pipeline experiences a future increase in the number of dwellings intended for human occupancy.

Table 841.322(f)-Edition 1999

Test Requirements for Pipelines and Mains to be Operated at Hoop Stresses of 30% or more of the SMYS of the pipe

1

2

3

4

5

..Pressure Test PrescribedMax. Allowable Operating Pressure, the Lesser of
Location ClassPermissible Test FluidMin.Max.
1

Division 1

Water1.25 x m.o.p.Nonet.p / 1.25
1

Division 2

Water1.1 x m.o.p.Nonet.p / 1.1

or d.p.

Air1.1 x m.o.p.1.1 x d.p.
Gas1.1 x m.o.p.1.1 x d.p.
2Water1.25 x m.o.p.Nonet.p / 1.25

or d.p.

Air1.25 x m.o.p.1.25 x d.p.
3 & 4

(Note 1)*

Water1.4 x m.o.p.None or d.p.t.p / 1.4

or d.p.

* Note 1. For exceptions, see Para. 841.322(d).

m.o.p. = max. operating pressure (not necessarily the max. allowable operating pressure)

d.p. = design pressure

t.p. = test pressure

Unquoted

__________________
It is better to be defeated on principles, than to win on lies!
Reply Good Answer (Score 5)
Guru

Join Date: Mar 2007
Posts: 2550
Good Answers: 103
#3

Re: Hydrostatic Test Requirements

08/29/2009 9:52 AM

Since you are on Gas line, did you check-up on API standards? you are likely to be covered under those.

What is likely temperature of the gas?

Will not be able to help at the moment, Saturday, libraries closed, as is tomorrow, but you may try to find it on API's web.

__________________
Fantastic ideas for a Fantastic World, I make the illogical logical.They put me in cars,they put me in yer tv.They put me in stereos and those little radios you stick in your ears.They even put me in watches, they have teeny gremlins for your watches
Reply
Anonymous Poster
#4

Re: Hydrostatic Test Requirements

09/01/2009 9:30 AM

hi hero

You were telling hydro-test on 10'' line(gas);at the completion of the test

While doing hydro testing on system,compulssory to submit system wall temparature and water temparature(optional) along with pressure record.

Why?

Because if temp goes up at the same time pressure up.Vice versa

For ex:Assume there is a small leak in a system,at the same temp is goes up.

during that period pressure is not fall down due temp is goes up.

if u have doubt plz mail me reddy675@gmail.com

Reply Off Topic (Score 5)
Reply to Forum Thread 4 comments

Good Answers:

These comments received enough positive votes to make them "good answers".
Copy to Clipboard

Users who posted comments:

Abdel Halim Galala (1); aniltiwari (1); Anonymous Poster (1); sb (1)

Previous in Forum: Pump suction line full vacuum in transient simulation   Next in Forum: mechanical engineer fresher

Advertisement