Previous in Forum: Analyzer Terminology   Next in Forum: Flange Rating
Close
Close
Close
Rate Comments: Nested
Anonymous Poster

Quality Formats for IMBS

09/02/2009 6:37 AM

Dear all,

What are the critical points to be checked during the installation of the following IBMS (integrated building management system) as a part of the quality assurance plan at site.

(1) Smoke detector

(2) Hooter

(3) Fault Isolation module

(4) Output module

(5) Control module

(6) Fire alarm control panel

(7) Repeater panel

(8) Heat detector

(9) Reflector

(10) Transmitter

(11) MCP(Manual call point)

(12) Strobe light

(13) Speakers ( Wall mounted, Ceiling mounted, Column mounted)

(14) Cameras (Indoor, Outdoor, PTZ cameras)

(15) DDC panel

(16) Access controlled system along with Door manager, smart card reader, magnetic lock etc

Can some one provide me a check list or few salient points regarding this??

Thanks

PG

Reply

Previous in Forum: Analyzer Terminology   Next in Forum: Flange Rating
You might be interested in: UV Cameras, Smart Cameras, Video Cameras

Advertisement