Separate Readings Without Dual Energy Meters

09/03/2009 5:58 AM

DEAR ALL

I HAVE 4 NUMBER OF ENERGY kWH METER FOR BILLING OF OUR RENTED CUSTOMER.NOW PROBLEM IS THAT METER WORK ON BOTH DG SUPPLY AND ALSO ON ELECTRICITY BOARD SUPPLY.NOW HOW CAN I SEPRATE THE READING dg AND ELECTRICITY BOARD SO THAT I CAN CLAIM BOTH READING ON SEPRATE RATE PER kwh.

METER READING-1 15000 UNIT

METER-2 READING 4500 UNIT

METER-3 READING 9928 UNIT

METER-4 READING 10228 UNIT

TOTAL DG RUNNING HOURS DURING THIS MONTHS 82 HOURS

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
United Kingdom - Member - Not a New Member Hobbies - Musician - New Member Hobbies - Fishing - New Member

Join Date: May 2006
Location: Reading, Berkshire, UK. Going under cover.
Posts: 9684
Good Answers: 468
#1

Re: SEPRATION OF READING WITHOUT DUEL ENERGY METER

09/03/2009 6:09 AM

" HOW CAN I SEPRATE THE READING dg AND ELECTRICITY BOARD .."

In short, you can't. You have no way of telling which of the meters was passing current during the time the DG was running, or how much was consumed during that time. You're trying to close the stable door after the horse has bolted.

BTW - PLEASE turn off caps lock. Posting in upper case is considered SHOUTING.

__________________
"Love justice, you who rule the world" - Dante Alighieri
Register to Reply
Power-User

Join Date: Jul 2007
Location: The cigarette-stained drunkard living in the cardboard box outside Marks & Sparks delivery entrance, Eastgate Shopping Centre, Basildon.
Posts: 487
#2

Re: SEPRATION OF READING WITHOUT DUEL ENERGY METER

09/03/2009 6:39 AM

Oi! dineshpandit80! Turn it down, mate! Some of us are trying to get some kip! <Wheeze>

__________________
Essex jobs for Essex yobs! <Burp>.
Register to Reply
Commentator

Join Date: Mar 2009
Location: delhi india
Posts: 79
Good Answers: 2
#3
In reply to #2

Re: SEPRATION OF READING WITHOUT DUEL ENERGY METER

09/03/2009 6:49 AM

Dear sir

is there is not way to solve it ,in old days when Duel meter was not avalable what metod was adopted by electrical engineer

Register to Reply
Power-User

Join Date: Jul 2007
Location: The cigarette-stained drunkard living in the cardboard box outside Marks & Sparks delivery entrance, Eastgate Shopping Centre, Basildon.
Posts: 487
#4
In reply to #3

Re: SEPRATION OF READING WITHOUT DUEL ENERGY METER

09/03/2009 7:37 AM

Did you read #1? <Splutter, wheeze>

__________________
Essex jobs for Essex yobs! <Burp>.
Register to Reply
Commentator

Join Date: Mar 2009
Location: delhi india
Posts: 79
Good Answers: 2
#5

Re: SEPRATION OF READING WITHOUT DUEL ENERGY METER

09/03/2009 8:09 AM

can i use this method ,is it right

Total KWH /Months=15000+4500+9928+10228=39656

KW=39656/24*31

=53.30

Total KWH of DG =53.30*80 hours(DG hours avalable)

=4264

Total KWH of electricity board=39656-4264=35391 ,is it possible or not

Register to Reply
Guru
United Kingdom - Member - Not a New Member Hobbies - Musician - New Member Hobbies - Fishing - New Member

Join Date: May 2006
Location: Reading, Berkshire, UK. Going under cover.
Posts: 9684
Good Answers: 468
#7
In reply to #5

Re: SEPRATION OF READING WITHOUT DUEL ENERGY METER

09/03/2009 8:39 AM

No, it's not right - as sb points out, you have no way of knowing how much (if any) power was used while the DG was running.

__________________
"Love justice, you who rule the world" - Dante Alighieri
Register to Reply
Guru

Join Date: Mar 2007
Posts: 2550
Good Answers: 103
#6

Re: SEPRATION OF READING WITHOUT DUEL ENERGY METER

09/03/2009 8:22 AM

It is too approximate. It depends upon the purpose, but except extremely pliant other party it is not OK

If it is for paying to the electricity board, you should have connected the DG output after one main Electricity board meter, and may be put another meter for the DG set. Or for each of the user put the connections after their respective meters.

The simple reason is this, there is a power cut in the night of summer, all ACs on, you feed through DG and in the day when demand is low, you feed from the grid. Do you see the averages not matching?

__________________
Fantastic ideas for a Fantastic World, I make the illogical logical.They put me in cars,they put me in yer tv.They put me in stereos and those little radios you stick in your ears.They even put me in watches, they have teeny gremlins for your watches
Register to Reply
Guru
United States - Member - New Member

Join Date: Jun 2008
Location: Alabama
Posts: 1604
Good Answers: 63
#8

Re: SEPRATION OF READING WITHOUT DUEL ENERGY METER

09/03/2009 11:46 AM

You can install a meter for the generator. This will give your the total kwh's the generator supplied but will not tell you which custormer used it.

Register to Reply
Register to Reply 8 comments
Copy to Clipboard

Users who posted comments:

dineshpandit80 (2); JohnDG (2); sb (1); Stinky Pete (2); wareagle (1)