P11, P22, P9 and P91 Material

01/11/2010 12:43 AM

i want to take radiography test of P11, P22, P91

tell me how many presentage of redigraphy i'll take ,

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Anonymous Poster
#1

Re: P11, P22, P9 and P91 Material

01/11/2010 5:39 AM

The Rt % (and for all NDT's) depends not only of grade of the material. Pressure, Temperature, Thickness, Type of fluid.........

Normally when alloys with PWHT requires, % or full RT, a good practice is RT before and after PWHT

Reply
Commentator

Join Date: Jan 2010
Location: Jamestown, North Dakota
Posts: 62
Good Answers: 1
#2
In reply to #1

Re: P11, P22, P9 and P91 Material

02/23/2010 8:07 AM

The % of NDT, particularly X-Ray (radiography) is specified by the governing Code. It is intuitive that for High pressure steam systems, 100% is most typically required. But, check the Code, first. A good place to start is with you supplier. they may have a metallurgist that can render a the help you need. Also, check your contract documents for the Code required, and engineering requirements that may specify more stringent testing that may be required by the Code.

__________________
"Careful planning followed by rapid execution." Napoleon