We have to weld piping support clips/cleats for supporting additional pipes on the shell of an existing crude oil distillation column (designed as per ASME section VIII Div. 1. Design pressure 2 kg/cm2g)
Is it necessary to hydrotest entire column after the welding ? Is there any alternative method for weld quality assurance which will eliminate hydrotest & thereby save time & resources spent on hydrotest?