Previous in Forum: undervoltage trip.   Next in Forum: vector group transformer 3 phase
Close
Close
Close
3 comments
Rate Comments: Nested
Anonymous Poster

UPS tests ???

02/14/2010 7:52 AM

helo sirs.

My consultant told me to test the 225KVA ups. and he told me to carry out all the standard testings.

i just know the following tests. UPS discharge test, Autonomy or ATS testing, voltage drip test.

i searched alot to find out which tests are included in standard testing and under wat standards or specification. If someone can help me out in this one, i will very grateful to him .

kind regards.

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#1

Re: UPS tests ???

02/14/2010 9:37 AM
Reply
Anonymous Poster
#2
In reply to #1

Re: UPS tests ???

02/14/2010 9:44 AM

the link is not working for me ... please provide the alternative link. thanks

Reply
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#3
In reply to #2

Re: UPS tests ???

02/14/2010 9:56 AM
  1. UPS Testing for Reliable Backup PowerUPS full load battery discharge test. This is done to demonstrate correct UPS operation for 15 minutes at full load during a power failure. The procedure ...
    ecmweb.com/mag/electric_ups_testing_reliable/ - Cached - Similar -
  2. Effective UPS Testing - Electric Power & Transmission ...Consequently, we revamped our testing procedures to begin functionally testing our UPS equipment along with its associated batteries. ...
    www.eng-tips.com › ... › Electric power engineeringFAQs - Cached - Similar -
  3. Are Your UPS System Batteries Really Ready to Load Test?factored into the load test procedure. Unless the purchase specification called for a different operating temperature, the UPS battery was sized by the ...
    www.batterypoweronline.com/images/PDFs_articles.../Liebert.pdf - Similar -
Reply
Reply to Forum Thread 3 comments

Previous in Forum: undervoltage trip.   Next in Forum: vector group transformer 3 phase

Advertisement