To manufacture silicon (e grade), 670 kWh per kg is required, which is equivalant to 800 days of solar days radiation. You are burning fossil fuel before reimbersment and there seems to be a low ROI or saving of resources. There is a need of alternate methods to produce photovoltaic cells.