DG Requirement for Tunnel Project

10/21/2010 1:42 AM

Hello

I want to know that how we calculate the capacity of DG requried in a tunnel project of 9 km, considering breakdown of 1 of the DG., having boomers of 700 kw, shotcrete of 300 kw, haggloader of 110 kw, ventilation fan of 1000 kw, my total loads comes out to be 2682 kw.

guest

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
Canada - Member - If there is a way to screw someting up, there is someone to do so! Safety - Hazmat - New Member

Join Date: Mar 2007
Location: Iqaluit, NU. Canada
Posts: 1854
Good Answers: 140
#1

Re: DG Requirement for Tunnel Project

10/21/2010 9:18 AM

Nowhere near enough info to answer this question properly. Given the limited data you offered, 2 DG sets of 3MW each should be in the ball park.

__________________
Joe Contractor to Electrical Inspector, "What do you mean you are going to make me follow the code?".
Reply
Anonymous Poster
#2
In reply to #1

Re: DG Requirement for Tunnel Project

10/22/2010 1:39 AM

Hi

I am having a total load of 2682 kw. now, i want to see what capacity of DG i need on my site.

Like, 1000 KVA * 2 + 750 KVA * 2 + 500 KVA * 2 = 4500 KVA

Assuming 1 dg on stand-by.

What all factors we consider while doing calculation.

Reply