I would like to request if you could help me with
a full schematics and electrical drawings for
Generator Installation with AMF panel.
Please you will also help/provide me the list of
main equipment in the schematics with full explanation for the installation.
The details are as follows:
From the site survey we did:
1. A 210KVA perkins generator has already been in
operation which serve as a stand-by and connected with utility MAINS thru an
AMF panel
2. A new 410KVA caterpillar generator were to be
installed which will be connected with the utility MAINS and with the already
installed 210KVA thru another AMF panel.
3. We intend to use these packages with AMF
panel(for the two generators and MAINS).
Please do contact me for further information
which could help in the drawings.
Thanks for your help.
Regards
Larry