Greetings to fellow Members at CR4.
Requesting members on clarification of the following points/ doubts regarding Hydro power.
1] For a large scale Hydro Power plant, say a 1000 M.Watts ultra power plant-what could be the ideal individual turbines size, so as to work flexibily as Base load as well as peak load power plant.
The break up can be like this 1]50% capacity as base load & 50 % capacity as peak load, 2]75 % capacity as base load & 25% as peak load.
2] What range of unifrom Turbine capacites are best suited for such a set up in the long run[ 50 MW or 100 M.W or suitable other capacities?]
2] Excluding the civil costs part of a Hydro Power plant, is there any relationship exist between costs of Turbine capacity Vs respective Electrical generator?
Any data base or any correlationship or reference sources are most welcome.