Acceptance Criteria for Hydrostatic Test of Pressure Vessels

10/30/2011 7:48 AM

Dear Folks, i am new in this forum and its very nice to see all the discussions made in this forum. i want to raise a Question for all you people expert advice that:

Q) Is there any criteria for temperature reduction during holding time that we can accept for both new construction and in-service?

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

Good Answers:

These comments received enough positive votes to make them "good answers".

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#1

Re: Acceptance crieteria for Hydrostatic Test of Pressure vessels

10/30/2011 9:30 AM

Depends on what specification you are working to. What controls the design, construction and inspection of the vessel?

Register to Reply
2
Guru
Engineering Fields - Mechanical Engineering - New Member India - Member - New Member

Join Date: Aug 2008
Location: City of destiny, INDIA
Posts: 775
Good Answers: 67
#2

Re: Acceptance Criteria for Hydrostatic Test of Pressure Vessels

10/31/2011 1:23 AM

Normally temperature variation of water pumped inside the pressure vessel for hydrostatic test during the test period is negligible, so temperature correction is not suggested. However, if your test period is longer and you expect significant temperature variation, seek guidance from expert testing agencies.

As per my experience, about 0.075 litres of water is to be pushed per cubic meter of vessel to raise pressure by 1 bar. Cubical expansivity of water is 0.214 litre/cu.m, so variation of temperature may cause variation in test pressure by 2.85 bar/deg.C.

Register to Reply Good Answer (Score 2)
Guru
Engineering Fields - Mechanical Engineering - New Member India - Member - New Member

Join Date: Aug 2008
Location: City of destiny, INDIA
Posts: 775
Good Answers: 67
#3
In reply to #2

Re: Acceptance Criteria for Hydrostatic Test of Pressure Vessels

10/31/2011 3:18 AM

Small correction in my own comment:

Unit of cubical expansivity of water shall be corrected as 0.214 litre per cu.m per deg.C instead of 0.214 litre/cu.m.

Register to Reply
Power-User
Hobbies - CNC - New Member

Join Date: Feb 2010
Location: Vallejo, CA
Posts: 127
Good Answers: 8
#7
In reply to #2

Re: Acceptance Criteria for Hydrostatic Test of Pressure Vessels

10/31/2011 9:45 AM

That 75 mL per bar would increase as the vessel approached its yield strength. Diligent hydrotesting of pipelines includes not only holding test pressure for 8 or more hours, and in some cases, spiking the pressure to the full SMYS, but then running a measurement pig to demonstrate that none of the pipe stretched beyond specifications. Enbridge had around 10% of joints on one line stretch over 1%. Those that were over 2% were replaced.

FWIW

Register to Reply Off Topic (Score 5)
Active Contributor

Join Date: Oct 2011
Posts: 24
#4

Re: Acceptance Criteria for Hydrostatic Test of Pressure Vessels

10/31/2011 5:06 AM

Noted. Thanks for the expert advice....it will be nice to more threads...

Register to Reply
Active Contributor

Join Date: Oct 2011
Posts: 24
#5

Re: Acceptance Criteria for Hydrostatic Test of Pressure Vessels

10/31/2011 5:10 AM

In addition to this "Can anyone explain how during holding time how much pressure drop is allowed in order to accept the test, e.g, if a system to be tested at 100 Bars, during holding time if pressure drops to 90 bars will it be acceptable or simply no leak is acceptable at all.

Register to Reply
Guru
Engineering Fields - Mechanical Engineering - New Member India - Member - New Member

Join Date: Aug 2008
Location: City of destiny, INDIA
Posts: 775
Good Answers: 67
#6
In reply to #5

Re: Acceptance Criteria for Hydrostatic Test of Pressure Vessels

10/31/2011 7:53 AM

There should be simply no leak. In case of any leak observed, system is to be depressurised, leak is to be rectified and test to be repeated.

Register to Reply
Guru
United States - Member - USA! Hobbies - Musician - Sound Man Engineering Fields - Mechanical Engineering - More than a Hobby Technical Fields - Technical Writing - New Member

Join Date: Oct 2008
Location: City of Roses.
Posts: 2056
Good Answers: 101
#8

Re: Acceptance Criteria for Hydrostatic Test of Pressure Vessels

10/31/2011 2:56 PM

Pressure Vessels are designed to strict standards/codes. All the information you need is outlined in the ASME pressure vessel code book.

__________________
Don't believe everything you read on the Internet!
Register to Reply Score 1 for Good Answer
Active Contributor

Join Date: Oct 2011
Posts: 10
#9

Re: Acceptance Criteria for Hydrostatic Test of Pressure Vessels

11/02/2011 3:17 AM

acceptance criteria for hydrostatic test depends upon the quality of the vessel in standards which are given to it like iso standards,bis standards,jis standards,din standards etc.

Register to Reply Off Topic (Score 6)
Register to Reply 9 comments

Good Answers:

These comments received enough positive votes to make them "good answers".

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Copy to Clipboard