Previous in Forum: advertisement in Commercial Space   Next in Forum: ANSI Cast Bellow Sealed Gate Valve
Close
Close
Close
Rate Comments: Nested
Anonymous Poster #1

Hydro Test of Pipelines required

02/19/2013 7:10 AM

Please suggest that, In the terminal we have Pipeline system in subsea about 300 Meters and this system is about 15 Years old previously until 2 years before it was operated at 8 bar pressure, Due to some reasons operation of these lines are stop before 2 years but it remains filled with Diesel Oil, we started operation through these lines at 6 bar for the pread of 40 hours and now we wants to operate these lines again at maximum pressure, Is it required any testing like Hydro Test to operate these lines at 8 bar pressure or it is not necessary and what is the standard Or industry practice and also note that cathotic protection of lines is in working, and I want to know that what is the max life of any line when it should require to be Hydro test or any test to check the strength and integrity.

Reply

Previous in Forum: advertisement in Commercial Space   Next in Forum: ANSI Cast Bellow Sealed Gate Valve

Advertisement