Chemical Manufacturing Blog

Chemical Manufacturing

The Chemical Manufacturing Blog is the place for conversation and discussion about process equipment and control, biotech & environmental, specialty chemicals and nano-engineering. Here, you'll find everything from application ideas, to news and industry trends, to hot topics and cutting edge innovations.

Previous in Blog: Jingle All the Way?   Next in Blog: Green Chemistry's Impact — Revival or Regression
Close
Close
Close
Rate Comments: Nested

Making Motors Reliable

Posted January 02, 2008 7:06 AM

Motor reliability is often taken for granted in chemical manufacturing. However, when motor problems arise, the problems can result in considerable loses for the company. Improving motor reliability requires basic testing and benchmarking, which can improve outcomes and reduce downtime that results from motor failure. How do you minimize motor downtime?

The preceding article is a "sneak peek" from Chemical Manufacturing, a newsletter from GlobalSpec. To stay up-to-date and informed on industry trends, products, and technologies, subscribe to Chemical Manufacturing today.

Reply

Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
United Kingdom - Member - Indeterminate Engineering Fields - Control Engineering - New Member

Join Date: Jan 2007
Location: In the bothy, 7 chains down the line from Dodman's Lane level crossing, in the nation formerly known as Great Britain. Kettle's on.
Posts: 32175
Good Answers: 839
#1

Re: Making Motors Reliable

01/03/2008 5:37 AM

Mission-critical pumps often have a standby pump installed in parallel with the duty pump(s), and the controls arranged so that is any duty pump fails or is unavailable, the standby pump starts.

It is common to rotate the duty/standby designation at intervals (nightly?) without stopping the pumps so that in the event of a stoppage a different pump will start.

Maintenance practices vary. Some organisations like similar running hours on each pump. Others will let one pump's running hours advance over the other pumps so that it becomes the priority for planned preventative maintenance.

__________________
"Did you get my e-mail?" - "The biggest problem in communication is the illusion that it has taken place" - George Bernard Shaw, 1856
Reply
Reply to Blog Entry

Previous in Blog: Jingle All the Way?   Next in Blog: Green Chemistry's Impact — Revival or Regression

Advertisement