How Do I Set Up Phased Electricity Pricing?

02/26/2026 12:43 AM

I understand that electricity is now charged in segments, with off-peak and peak pricing. Setting it up can save on unnecessary costs, such as washing clothes at night when electricity prices are lower. Does this setting require an application, or will it be automatically charged according to this pricing method?

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Guru
Hobbies - DIY Welding - Wannabeabettawelda

Join Date: May 2007
Location: Annapolis, Maryland
Posts: 7940
Good Answers: 458
#1

Re: How Do I Set Up Phased Electricity Pricing?

02/26/2026 4:58 PM

Some utilities can implement Time Of Day (TOD) pricing because the utility has installed 'smart' meters that have data connectivity to the utility and can report usage in 'near real time'. A phone call to the utility is usually all it takes to set up TOD billing.

I recall that in the dark ages, the municipal utility company in Hingham, Mass. implemented TOD usage for the 80 gallon water heater in the house I grew up in, through the use of a separate meter that was configured (using an internal clock), to only operate during those off-peak hours. The TOD meter was connected to the lower heating element of the water heater. The top element of the water heater was connected to the 'normal' circuits in the panel.

Register to Reply Score 1 for Good Answer
Register to Reply

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!

Previous in Forum: Two Ground Wires in One Terminal - Within a Light Fixture   Next in Forum: Trip Circuit Supervision and IRF

Advertisement