load testing of a cherry picker

01/27/2008 11:54 PM

Is there any standard for load testing of a cherry picker(working platform with extendable boom mouted on a vehicle)

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Anonymous Poster #1
#1

Re: load testing of a cherry picker

04/05/2023 7:19 AM
Reply
Guru

Join Date: Mar 2007
Location: by the beach in Florida
Posts: 33392
Good Answers: 1817
#2

Re: load testing of a cherry picker

04/05/2023 7:51 AM

..."A load test is performed to verify that a specific crane or hoist will safely perform all of its functions while supporting a test load whose weight is at least equal to the equipment’s rated capacity. Because load tests confirm the ability of the crane and hoist to safely operate as intended, they must be completed whenever this overhead lifting equipment is newly installed, altered, repaired, or modified before being placed into service. Existing crane and hoist systems should likewise be load tested at a minimum of once every four years."...

"Because they are so critical to the safe operation of overhead cranes and hoists, there are several standards and specifications that detail load test requirements. These include:

http://www.overheadlifting.org/understand-the-basics-of-load-test-requirements/

__________________
All living things seek to control their own destiny....this is the purpose of life