API steel tank erection

01/29/2008 3:42 PM

Hello! I am looking for information about allowed tolerance for flatness of concrete slab under flat bottom of the tank designed in acc. to API 650. Bottom OD is 14 m, thickness 12 mm.

I need advice about sequence and directions of welding runs on bottom CS plates prepared with edges for V-groove in order to avoid (or minimise) heat distortion. The welding will manual with stick electrodes.

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
Engineering Fields - Piping Design Engineering - New Member Egypt - Member - Member since 02/18/2007

Join Date: Feb 2007
Location: Cairo, Egypt
Posts: 1733
Good Answers: 248
#1

Re: API steel tank erection

01/31/2008 6:14 AM

There is no need to to pour a concrete slap under the whole bottom of storage tank, only it is necessary to make a ringwall slap under the tank shell in accordance with API 650. Therefore, you can use any compacted sand under the whole bottom without a precise flatness.

For welding of bottom plates, it is permitted per API to use a lap joints. If you use butt joints, I prefer you install all plates with tack welding first, followed by completing the whole welds.

__________________
It is better to be defeated on principles, than to win on lies!
Register to Reply
Participant

Join Date: Jan 2008
Posts: 2
#2
In reply to #1

Re: API steel tank erection

02/03/2008 11:30 AM

Thanks for your comment. In my case the tank bottom will elevated 4 m above the ground, so the whole round concrete slab is nessesary. The tank is only designed as per API : its designation is a settler with slow rotating mixer blades close to the bottom. It is clear for me that all bottom plates will tack welded and more- weigth of tack welded rolled plates of tank shell have to put on perimeter of the bottom, and all bottom plates will welded with root welds and just upper runs have to be as far as possible one from another. I need the advise about proved method of the welding runs sequence and orientation in order minimise bottom plates deviation from horizontal. I can't many time to cool each weld and minimum 2 welders will engaged simultanesly for bottom welding.

Register to Reply
Participant

Join Date: Feb 2013
Posts: 1
#3
In reply to #1

Re: API steel tank erection

02/18/2013 10:29 PM

Do you have any methods to improvise in putting the bottom plates in place apart from using an air winch to pull in the plates?

Register to Reply
Register to Reply 3 comments
Copy to Clipboard

Users who posted comments:

Abdel Halim Galala (1); ezzy (1); flex (1)

Previous in Forum: measuring greasing in Bearing Housing   Next in Forum: How do I calculate shock loading

Advertisement