The location of the instrument tappings in process viewpoint

04/12/2008 2:10 AM

Hello everyone!

Please tell me...

Are there any process limitations in where to locate the instrument tappings on pipelines?

I want to know if there is any problem in installing the pressure and temperature guages near the choke valve ( upstream of the choke valve) at the beginning of the gas process line?

Thank you

~Heita~

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Power-User

Join Date: Mar 2007
Location: South East of Las Vegas just far enough to see the lights but far enough to not hear the coins falling
Posts: 282
Good Answers: 8
#1

Re: The location of the instrument tappings in process viewpoint

04/13/2008 2:07 AM

Try to allow for as many pipe diameters as possible before and after your tappings, 5-10 minimum if your readings are important. If they are just for daily reporting you can put them closer but put a valve in the tapping lines just in case you need to dampen your input signals.

Mike

__________________
Rule number one; Never ask a question unless you are prepared for an answer that you may not like.
Register to Reply
Guru

Join Date: Sep 2007
Posts: 1817
Good Answers: 7
#2

Re: The location of the instrument tappings in process viewpoint

04/13/2008 3:52 AM

Depending what you need them for, don't they prescribe where you should put them?

I always thought that any aperture, or change in, caused a pressure differential over that item. This means that up and down stream of a choke valve, you will find pressure irregularities that do not transpose to the nominal pressure in the whole of the pipe. Also the same with bends and branches.

Register to Reply
Anonymous Poster
#3

Re: The location of the instrument tappings in process viewpoint

04/13/2008 1:41 PM

All instruments shall be located at straight pipe only.The straight pipe required to be maintained is Minimum 5 times of the pipe size before any bends, valves etc...

For correct reading try to utilise the syphon for the pressure gauge, snubber for the thermo meter.

thanks, regards,

Peer mohamed.

Register to Reply Off Topic (Score 4)
Register to Reply 3 comments
Copy to Clipboard

Users who posted comments:

Anonymous Poster (1); case491 (1); miketheboilerguy (1)

Previous in Forum: Anodes will they work for a 22 Ton Beast?   Next in Forum: liquid silver viscosity

Advertisement