Hi friends, Can we discuss more about the test and testing procedures in LV and MV system? Regards Dennis

__________________
dennis
Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Guru
New Zealand - Member - Interested in everything- see my Profile please APIX Pilot Plant Design Project - Member - Member Engineering Fields - Electrical Engineering - Member Engineering Fields - Power Engineering - Member Engineering Fields - Civil Engineering - Member Hobbies - Musician - Autoharp and Harmonica Hobbies - Hunting - Member Hobbies - Fishing - Member

Join Date: Nov 2007
Location: Christchurch, (The Garden City), South Island, New Zealand
Posts: 4395
Good Answers: 230
#1

Re: Testings Procedures for LV and MV Systems

10/03/2008 3:02 AM

Hello koshy.dennis

Perhaps you may wish to be more specific.

There are thousands of different <"....test and testing procedures in LV and MV systems....">

A different testing scenario for every relay, discrimination apparatus, alarm panel, alternator, generator, motors of various types and sizes, starters various, insulators, bushings, transformers, circuit breakers of various voltages and currents, various makers of all that lot,...the list goes on, and on, and on.

Reply here, with

Kind Regards....

__________________
"The number of inventions increases faster than the need for them at the time" - SparkY
Register to Reply
Associate

Join Date: Jun 2007
Location: dubai,UAE
Posts: 43
Good Answers: 1
#2
In reply to #1

Re: Testings Procedures for LV and MV Systems

10/03/2008 4:36 AM

Thanks for your prompt reply Can you please specify about test on circuit breakers,relays and cts If you have any source to know abt others test ,please specify that also thanks

__________________
dennis
Register to Reply
Guru
New Zealand - Member - Interested in everything- see my Profile please APIX Pilot Plant Design Project - Member - Member Engineering Fields - Electrical Engineering - Member Engineering Fields - Power Engineering - Member Engineering Fields - Civil Engineering - Member Hobbies - Musician - Autoharp and Harmonica Hobbies - Hunting - Member Hobbies - Fishing - Member

Join Date: Nov 2007
Location: Christchurch, (The Garden City), South Island, New Zealand
Posts: 4395
Good Answers: 230
#3
In reply to #2

Re: Testings Procedures for LV and MV Systems

10/03/2008 5:27 AM

Hello again, koshy.dennis

Each Circuit Breaker, Relay, etc has a specific method of testing, to ensure is is fully functioning as intended by the Switchboard Designers..

Each equipment item has it's own special test procedures, written normally by the Makers of the Circuit Breaker, Relay etc.

Each equipment item as purchased from new will have included as part of the purchase, the Manual for that item, supplied in 2 separate copies by the Makers.

All subsidiary items will have their testing procedures included into that "supplied with the equipment" pair of Manuals.

So you want procedures for everything, which would be a set of manuals occupying thousands of feet of your bookshelf.

A test setup as the equivalent of "The Theory of Everything".

Perhaps you should, as I advised earlier, some specifics.

Example:

You have at your Location a Switchboard which supplies a soap works.

it contains Busbars, Isolation Switches, Motor Starters, Fuses, Transformers, Relays, and perhaps hundreds of other equipment items.

There will be various makes, types, varieties of equipment.

The Switchboard Manual should contain the details of all above, along with Maker's details of full functional testing.

Can you see that what you ask for is an impossible task, as nobody knows what you have.

A. Are you asking a theoretical question?

B. Do you have specific equipment in mind?

If (B) above, then advise the equipment, with the relevant details please, and you may receive a proper answer.

Reply here, with

Kind Regards....

__________________
"The number of inventions increases faster than the need for them at the time" - SparkY
Register to Reply Score 1 for Good Answer
Associate

Join Date: Jun 2007
Location: dubai,UAE
Posts: 43
Good Answers: 1
#4
In reply to #3

Re: Testings Procedures for LV and MV Systems

10/03/2008 5:57 AM

i mean i would like to know about primary injection,secondary injection,megger,insulation withstanding,thermographic testing etc i tried to get practical notes but didnt get wat i m looking for.. Regards Dennis

__________________
dennis
Register to Reply
Guru
Safety - ESD - New Member India - Member - New Member Engineering Fields - Energy Engineering - New Member

Join Date: May 2007
Location: Pune , India
Posts: 875
Good Answers: 42
#5
In reply to #4

Re: Testings Procedures for LV and MV Systems

10/03/2008 9:24 AM

Dear Koshy.dennis,

I endorse the views of sparkstation. The relay testing is such a specialised field that one need specified training to use these testing equipments and is beyond the scope of discussion in this forum as it needs systematic training and practical demonstration. The relay testing equipment manufacturers provide the operating Manuel and arrange training for operation and test procedure. The testing of over current relay, earth fault relay and distance protection relays are most important for substations.The testing and calibration of CTs PTs and measuring and metering instruments forms the rest of testing job . The procedure of testing of circuit breakers are different for each type. The testing procedure of ACB , OCB,MOCB,VCB and SF6 are totally different . So depending up on the available equipment the test equipment and procedure have to be selected.

Register to Reply
Power-User
Engineering Fields - Electrical Engineering - Ron Nombri Engineering Fields - Energy Engineering - Ron Nombri Engineering Fields - Power Engineering - Eternal Power Papua New Guinea - Member - Ron Nombri

Join Date: May 2007
Location: Papua New Guinea
Posts: 174
Good Answers: 3
#6

Re: Testings Procedures for LV and MV Systems

10/15/2008 10:10 AM

Hi Dennis,

Listed below are some web-sites that you may want to check. They have some use full information as well as manufacturer manuals of some test instruments.

Some websites you may check;

  1. http://www.maintenanceworld.com
  2. http://www.inspect-ny.com/electric

You will find downloadable books in .pdf formats.

Some topics listed below;

Insulation Tests

  1. Insulation and Continuity Testers:

http://www.biddlemegger.com/biddle-ug/BM220_SER_UG.pdf

Electric Breaker Test

  1. Breaker Tests Procedures:

http://www.inspect-ny.com/electric/Electric_Breaker_Test.htm

Hope the above will help.

Cheers!

__________________
Kind regards, Ron
Register to Reply
Register to Reply 6 comments

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Copy to Clipboard

Users who posted comments:

koshy.dennis (2); Ron Nombri (1); Sparkstation (2); V.I.Abraham (1)

Previous in Forum: AC Breaker Trip   Next in Forum: resistor

Advertisement