PRESSURE VESSSEL ESPHERIC USITEN 375

10/18/2008 10:40 AM

IN THIS MOMENT WE ARE BUILDING TWO SPHERICS VESSELS THE MATERIAL OF PLATES TO DO THIS ESPHERES IS USITEN 375C WHIT 38.10 MM OF THICKNES.

NOW WE ARE WELDING THE PLATES IN ORDER TO BUILD THIS SPHERICS IN SITE AND WE HAVE SOME PROBLEMS AT THE WELD AND BASE MATERIAL IN ANY JOINTS . I WANT TO KNOW IF YOU HAVE OR KNOW ANY RECOMENDATION TO WELD THIS KIND OF PLATES OR MAYBE SOMEBODY CAN SUGGEST US ANY MATERIAL TO DO THE WELD

__________________
"The most important in this life is not to know where one is, but where one is going"
Register to Reply
Pathfinder Tags: USITEN 375 ESPHERIC VESSEL
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

Good Answers:

These comments received enough positive votes to make them "good answers".

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Guru

Join Date: Jul 2008
Location: Anywhere I may be at the time
Posts: 661
Good Answers: 16
#1

Re: PRESSURE VESSSEL ESPHERIC USITEN 375

10/18/2008 10:42 PM

Current process and current problems experiencing??????

Register to Reply
Guru
Hobbies - Model Rocketry - New Member

Join Date: Jun 2007
Location: East of Seattle, Washington state Republic of the 50 states of America
Posts: 2045
Good Answers: 36
#2

Re: PRESSURE VESSSEL ESPHERIC USITEN 375

10/19/2008 1:16 AM

A) In computer messages ALL CAPITALS is SHOUTING. just so you know.

B) You have not given enough information. What type of welding? Are you pre heating? What rod, flux, filler, shield gas are you using? are you post(after) heating?

C) What type of weld inspection(s) are you using and is this during or post weld?

D) Has the base metal been checked by a metallurgist to verify it is correct and up to specification?

I'm a novice to welding (learning GTAW/TIG/Heliarc welding) so sounds like you will need to do a lot of research before you pressurize these tanks or risk disaster.

Brad

__________________
(Larrabee's Law) Half of everything you hear in a classroom is crap. Education is figuring out which half is which.
Register to Reply Score 1 for Good Answer
2
Guru
Engineering Fields - Piping Design Engineering - New Member Egypt - Member - Member since 02/18/2007

Join Date: Feb 2007
Location: Cairo, Egypt
Posts: 1733
Good Answers: 248
#3

Re: PRESSURE VESSSEL ESPHERIC USITEN 375

10/19/2008 5:55 AM

Too late to ask now for the recommended welding procedure(s). You have to stop any work in the project, and ask the installer to submit the WPS(s) and PQR(s) in accordance with the proper codes and standards (like ASME, BS, DIN, .... etc.).

Please, stop the work until satisfying yourself that all welding procedures are completed and fulfilling the code requirements w.r.t preheating, interpass heating, impact test, MDMT, PWHT, .... etc.

__________________
It is better to be defeated on principles, than to win on lies!
Register to Reply Good Answer (Score 2)
Anonymous Poster
#4

Re: PRESSURE VESSSEL ESPHERIC USITEN 375

10/20/2008 12:21 AM

thanks

we are welding whit E7018 and we have WPS and PQR`S.

we are doing a preheat at 95ºc before start the welding process but we don`t do post heat . the temperature in this zone of country is around 45ªC until 49ºc at peak time.

we do visual inspection, radiographic inspection, and some times ultrasonic inspection and the plate was verified by our people because we have in our team metallurgical engineers. (The plate is according whit especifications)

in especific the crack appear in:

1.-a joint between plates in ecuador zone. the crack have 1 until 2 inch lenght

2.-the join between the nozzle and hemisphere plate, and the crack appear charged to neck of the nozzle and this was produced after the post weald heat treatment.in this point of wels is neccesary PWHT because according ASME (the nozzle have 14" of diameter and have a reinforcing pad).

the PWHT is done in according ASME CODE UCS 56,

if you need more information to can help us whit your comments please let me know

GABRIEL

Register to Reply Score 1 for Good Answer
Guru
Engineering Fields - Piping Design Engineering - New Member Egypt - Member - Member since 02/18/2007

Join Date: Feb 2007
Location: Cairo, Egypt
Posts: 1733
Good Answers: 248
#6
In reply to #4

Re: PRESSURE VESSSEL ESPHERIC USITEN 375

10/20/2008 2:47 AM

From my experience, I think that there is a problem related with preheating and inter-pass heating. That thicker base metal need to be preheated. Also, very important for doing intermediate heating (between every two passes, unless the material not reached the required temp.). And you have to check and measure the temp. of the base metal before welding and between passes.

Also, it is very important while proceeding a PWHT for any part (not the whole vessel) to heat the area around and adjacent the portion where you doing the PWHT to control the rate of heating and cooling from that area and the areas around. Rapid cooling or heating will affect the mechanical properties of the material such as tensile, hardness and elongation and can cause cracking.

In addition to the following questions: Did you used:

1. A weld metal match with the base metal?

2. Qualified WPS's and PQR's?

3. Apply a PWHT in the qualified WPS's & PQR's?

4. E7018 in a heated condition as manufacturer's recommendation?

5. E7018 in uphill direction?

6. And many many questions related to joint design, welding parameters (volt, amp.& speed), attendance of a qualified inspector, ... etc.

__________________
It is better to be defeated on principles, than to win on lies!
Register to Reply
Guru

Join Date: Jul 2008
Location: Anywhere I may be at the time
Posts: 661
Good Answers: 16
#5

Re: PRESSURE VESSSEL ESPHERIC USITEN 375

10/20/2008 12:30 AM

Does your material come with documentation? If this is an isolated case, you may conceder removing as section in the affected area and send it to be analysed. You may have a bad mill run creating problems.

Register to Reply
Register to Reply 6 comments

Good Answers:

These comments received enough positive votes to make them "good answers".

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Copy to Clipboard

Users who posted comments:

Abdel Halim Galala (2); Anonymous Poster (1); Tim in Mexico (2); U V (1)