Previous in Forum: Voltage Optimization   Next in Forum: Design and installation of Grounding Ring
Close
Close
Close
Rate Comments: Nested
Anonymous Poster

about transformer

10/24/2008 10:25 AM

hi

what is terms and condition for installing the DG set (any rating ) how many earth should be provided? how many meter should be maintained between DG and wall incase od indoor?.what are the protection devices are installed?

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
Canada - Member - If there is a way to screw someting up, there is someone to do so! Safety - Hazmat - New Member

Join Date: Mar 2007
Location: Iqaluit, NU. Canada
Posts: 1854
Good Answers: 140
#1

Re: about transformer

10/24/2008 5:18 PM

Lets see... as we pull out our trusty crystal ball.

Terms & Conditions...

50% down on placement of order, 25% when completed and 25% when it blows up.

Ratings...

I think 1.5 TW (yes that is a "terra watt") would suffice.

Earth...

What do you think, does 625 m3 sound like its enough?

Clearence between the DG and the building...

How about 50 meters?

As to protection devices... a honking big 5000 amp glass fuse sounds rather pretty don't you think.

-------------------------

Lets get serious... how could anyone answer you seriously given what little you supplied.

__________________
Joe Contractor to Electrical Inspector, "What do you mean you are going to make me follow the code?".
Reply
Reply to Forum Thread

Previous in Forum: Voltage Optimization   Next in Forum: Design and installation of Grounding Ring

Advertisement