piping doubts

12/20/2008 2:07 PM

What is two phase flow and types?

what is long distance and cross-country pipelines?

what is phase of material take off / BOO for piping?

What is CCOE approval drawings?

What is HAZOP methodology?

To learn more about piping is there need to have the knowledge of SCADA?

__________________
thoughts becomes things.
Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
Engineering Fields - Piping Design Engineering - Retired Piper

Join Date: Feb 2007
Location: Bayonet Point, Florida
Posts: 635
Good Answers: 61
#1

Re: piping doubts

12/20/2008 6:43 PM

Sandeep, First a little suggestion about words.
You titled your post as: "piping doubts". This is not correct english. You have piping questions not doubts. Doubts is when you don't believe what I tell you or you doubt your own ability to do sometning.

Now to your questions.

1. What is two phase flow and types?
An example of two phase flow would be a fluid and a gas (or vapor) in a pipe at the same time. Example: Steam and condensate or liquid hydrocarbon and vapor hydrocarbon, etc.

2. What is long distance and cross-country pipelines?
As long as it needs to be to get from one point to another. There is no minimum or maximum length.

3. What is phase of material take off / BOO for piping?
Different companies use different timing and terms. Basicly there might be three material-offs. There mightr be a preliminary MTO, an intermediate MTO and a final MTO. I dont know what a "BOO" is. We (and most people around the world use the term "Bill-of-Material" (BOM). A BOM is a list of materia for the specific drawing.

4. What is CCOE approval drawings?
I do not know this term, sorry.

5. What is HAZOP methodology?
A Hazop review looks at everything in the plant or project that could go wrong, how could it go wrong, how to prevent it from going wrong and have all the safe guards been built into the project.

6. To learn more about piping is there need to have the knowledge of SCADA?
I think SCADA is only associated with instrumentation and controls of cross-country pipelines. As such, I do not think it is mandatory for a piper to know all about SCADA but it might be wise to know some of the basics.

__________________
Do it once and do it right
Register to Reply
Guru
Engineering Fields - Piping Design Engineering - New Member Egypt - Member - Member since 02/18/2007

Join Date: Feb 2007
Location: Cairo, Egypt
Posts: 1733
Good Answers: 248
#2

Re: piping doubts

12/21/2008 3:20 AM
__________________
It is better to be defeated on principles, than to win on lies!
Register to Reply
Member

Join Date: Sep 2008
Location: jamaica....to T&T
Posts: 6
#3

Re: piping doubts

12/21/2008 10:23 PM

CR4 is the most informative eng site i know keep up the good work young eng like myself have nothing but respect for you guys.

__________________
taking it To Di WorLd....evil "lol".....Di WorLd iZ Mine
Register to Reply
Member

Join Date: Jun 2008
Posts: 6
#4

Re: piping doubts

12/22/2008 4:59 AM

hi sandeep

fluid is a substance which can not permanantly distorted. this is exact defination of fluid. two phase flow means nothing but liquid and gas(vapour) flowing simaltenously through pipe.

CCOE : chief control of explosive(this is indian Govt body) which deals with the petrochemical/petroleum plant layout drawings, in india this is mandodary to summit equipment layout study before finalalised for above mention plants only.(if your site is in india) CCOE office is in nagpur maharashtra.

If you know ASME 31.4 which deals with the cross-country pipelines the name itself suggest that one country to another conurty pipe lines. (in Hazhira site gujarat you can find this long length pipeline)

HAZOP study related to plant safety.before commisioning the plant this is require.

SCADA this is not related to piping (instrument only).what you want related to piping?

i hope this is enough information but still you r not satisfy mail me your doubts(piping).

!!JAY MAHARASHTRA!!

Register to Reply
Power-User

Join Date: Jul 2008
Location: India
Posts: 452
#5
In reply to #4

Re: piping doubts

12/22/2008 2:06 PM

What is hook-up Diagram?

__________________
thoughts becomes things.
Register to Reply
Anonymous Poster
#6
In reply to #5

Re: piping doubts

12/22/2008 5:31 PM

It would be faster if you just posted all of your home work questions all at once rather than a few at a time.

Travis

Register to Reply
Anonymous Poster
#7
In reply to #5

Re: piping doubts

07/15/2010 4:26 AM

HOOK _UP DIAGRAM :-

Hook-up diagram means the at both receiving and dispatch terminals of the cross country pipeline , the metering and filtering as well as pigging facilities are provided for the purpose of metering the flow, filteration for clean product should go inside the pressure boosting pump/ compressor and pig launcher / receiver for the cleaning of pipeline. The complete P&ID of this facity is called the hook up diagram.

Furhet information reqd. plz ask.

Harshad Wasnik

Register to Reply
Register to Reply 7 comments
Copy to Clipboard

Users who posted comments:

Abdel Halim Galala (1); Anonymous Poster (2); odzdgr8 (1); PennPiper (1); pranavchaudhari (1); sandeep lokhande (1)

Previous in Forum: welding   Next in Forum: ALLOWABLE STRESS BASIS IN VIII-2

Advertisement