Calculation Construction Measurement

12/25/2008 11:02 PM

How to measure that the quantity of plywood used on the formwork ?

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
Popular Science - Weaponology - bwire Hobbies - Car Customizing - New Member

Join Date: Dec 2007
Location: Upper Mid-west USA
Posts: 7498
Good Answers: 97
#1

Re: Calculation Construction Measurement

12/26/2008 12:53 PM

Good question and what criteria would manage the quantity?

__________________
If death came with a warning there would be a whole lot less of it.
Register to Reply
Active Contributor

Join Date: Mar 2008
Posts: 16
#2

Re: Calculation Construction Measurement

12/26/2008 9:14 PM

Wouldn't the weight of the concrete filling it be a factor? And then there's making sure that the plywood doesn't absorb the moisture from the concrete.

Anyways, taking Concrete Design this semester so any info here would be appreciated.

Register to Reply
Member

Join Date: Aug 2008
Posts: 7
#3

Re: Calculation Construction Measurement

12/27/2008 12:06 AM

As far as i know,its to be measured by the metric run and area units so you have to calculate all the lengths and areas of concrete you are having then you can get the quantity of plywood you will use

Register to Reply
Active Contributor

Join Date: Sep 2008
Posts: 15
Good Answers: 1
#4

Re: Calculation Construction Measurement

12/27/2008 4:23 AM

Hi!

The unit for plywood measurement is the area of its usage. It is expressed either in square metres or square feet, as the case may be...

Register to Reply
Anonymous Poster
#5

Re: Calculation Construction Measurement

12/27/2008 5:20 AM

hi,

its depen on type of form work,

1. suppose there is concrete slab with beam - you have to take depth of beam after deduction slan thickness.

2.battens etc to be decided as per size of beams/structure.

3. for columns - you have to consider clear length & width and minimum height 8ft (8ftX4FT standard SIZE OF BOARD available)

Register to Reply
Anonymous Poster
#6

Re: Calculation Construction Measurement

12/27/2008 9:16 AM

As per standard method of measurements, qty of ply wood or any shuttering material will be calculated as the area of formwork that came into contact with concrete. Generally it will be in Sq.M or SFt. deduction rules also follows.

Register to Reply
Guru
United Kingdom - Member - Not a new member!

Join Date: Jun 2008
Location: USA/Europe
Posts: 4547
Good Answers: 68
#7

Re: Calculation Construction Measurement

12/29/2008 10:13 PM

Hello karfung,

I have always worked it out by the M³.

But you have to take into account the other supporting formwork apart from the contact with concrete board. It can sometimes be several times the cost of the shuttering ply.

Welcome karfung!

Have a great new year...................

__________________
Take it easy, bb. >"HEAR & you FORGET<>SEE & you REMEMBER<>DO & you UNDERSTAND"<=$=|O|=$=>"Common Sense is Genius dressed in its Working Clothes"<>[Ralph Waldo Emerson]
Register to Reply
Anonymous Poster
#8

Re: Calculation Construction Measurement

01/05/2009 1:35 PM

Calculate the area of the basic square/rectangular shape concrete surfaces. A plywood sheet is standard 4'x8' rectangular. Also, figure in the odd shaped areas to be cut from additional sheets of plywood. So try to figure the forms in terms of large sections of rectangles in which you can cut sheets to fit. If they are wider at the narrowest distance than half a sheet, you will use one sheet per 4'. If you have a lot of odd shaped areas, well you will have to figure out how to cut each from sheets that are 4'x8', trying to minimize losses. Plywood is easy to come by, so being off by a couple of sheets is not bad, plus you have some get damaged at the work site, so you never have an exact estimate when the construction crews get going.

Register to Reply
Register to Reply 8 comments
Copy to Clipboard

Users who posted comments:

Anonymous Poster (3); babybear (1); bwire (1); mamkept (1); plan (1); zultekmilennia (1)

Previous in Forum: Casting Concrete On-Site   Next in Forum: Column tubes.

Advertisement