CEC- part I question

01/30/2009 4:10 PM

I am working on a project and not sure about some of the CEC-part I rules, I have the following two questions:

1) Could I run a primary and secondary feeders to/from transformer cables (15kv, 3c, #2, teck primary and 1kv, 3c, 350mcm secondary in the same conduit?), as the code calls for a barrier. I know I can not run two different voltages in one conduit if the lower voltage circuit cable has to be rated to the same voltage insulation as the higher one. But I do not know if both are teck cables whether I can run two different voltages in the same conduit?

2) On the cable tray there is existing 15kv URD cable, and I want to run a new 3c-teck 1kv cable, does the teck armored be considered as a mechanical separation running with URD. I know if both circuit are armored, yes the armor is enough physical separation, but if one circuit is URD and one is teck, is still enough mechanical separation?

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
Canada - Member - If there is a way to screw someting up, there is someone to do so! Safety - Hazmat - New Member

Join Date: Mar 2007
Location: Iqaluit, NU. Canada
Posts: 1854
Good Answers: 140
#1

Re: CEC- part I question

01/30/2009 8:39 PM

I will comment tomorrow on this.

__________________
Joe Contractor to Electrical Inspector, "What do you mean you are going to make me follow the code?".
Reply
Anonymous Poster
#2
In reply to #1

Re: CEC- part I question

01/31/2009 3:17 PM

North of 60, I am looking forward for your comment.

Thank you,

Reply