method of statement

02/16/2009 3:24 AM

hi, i would appreciate if some one tell me that what are the basic things prior to mobilizing to the work site? i.e. method of statement for mobilizing,

thanks

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Member

Join Date: Aug 2008
Posts: 7
#1

Re: method of statement

02/16/2009 3:37 AM

Hello

As far as i know,from the main things required prior to mobilizing are:

-Building permit from the authorities or the owner.
-QCP:quality control plan.
-Programm for the works.
-Safety plans and risk assessement.

That things are required in the construction field but there are more things required which are depending on the type of projects.
Regards

Reply
Participant

Join Date: Feb 2009
Posts: 4
Good Answers: 1
#2

Re: method of statement

02/16/2009 8:01 AM

I would think you would want to see a topographic layout, surveyors layout, soils report, and a water run off report. I would definetly require a soils report, and geotech report. This will help you to better understand what you are up against.

Reply
Associate
Engineering Fields - Construction Engineering - New Member United States - Member - New Member Hobbies - Hunting - New Member

Join Date: Jan 2009
Location: Rocky mountains U.S.
Posts: 51
Good Answers: 4
#3

Re: method of statement

02/16/2009 1:01 PM

Those are good answers!But they only scratch the surface of what you need, more details are required to give you the answers you are looking for. were are you building and what?

__________________
Most problems have simple low tech solutions
Reply
Reply to Forum Thread 3 comments
Copy to Clipboard

Users who posted comments:

Common cents (1); konkret (1); mamkept (1)

Previous in Forum: Steel Tube Api 5CT grade J55   Next in Forum: construction

Advertisement