Hi there
I am completing a project which includes a 160kW UPS supplying a computer suite. The rack cabinets have integrated cooling, in the form of Liquid Cooling Packages (LCPs) for each. These packages can extract up to 30kW of heat from each cabinet. When I asked about testing these, this was met with a shrug.
I want to install approx 30kW of heating in each cabinet. Switched in say 4 stages. The load bank must fit into a rack, with internal space about 450mm wide, 600 deep and 1800 high. I want to run this for about 6 hours, so no Mickey Mouse stuff. Getting a load bank is easy, but getting it to fit has proved unresolvable.
Fingers in ears, teeth gritted into wind, feet firmly planted, I await your torrent of advice.....