Dear friends,
As I am not an electrical engineer,I would like to know the statuatory requirements as well as other electrical items including civil works for getting HT power supply to the residential building right from the substation to the transformer and from transformer to the panel inside the building.Appreciate the difference in requirements for low tension and high tension requirements.