Dry transformer maintenance plan

12/19/2009 1:29 PM

producers suggest for resin cast dry trafos only cleaning and bolts tightening. but what about insulation resistance, wiring resistance, Doble test, etc. -

by now I for sure plan to do:

at least yearly

- visual inspection

- bolts tightening

- cleaning

- protective devices testing

- phermography

- ultrasonic inspection

is this enough ? do anybody has experience in this ?

Register to Reply
Pathfinder Tags: Dry transformer
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
Panama - Member - New Member Hobbies - CNC - New Member Engineering Fields - Marine Engineering - New Member Engineering Fields - Retired Engineers / Mentors - New Member

Join Date: Dec 2006
Location: Panama
Posts: 4273
Good Answers: 213
#1

Re: Dry transformer maintenance plan

12/19/2009 11:03 PM

Most important are the visual inspection and bolt tightening. I generally run a megger test between primary and secondary windings as well, because where I live, humidity is the killer. I will usually douse exposed metals with a moisture displacing electrical spray (especially exposed core laminations- I have seen significant separation of laminations due to moisture ingress and subsequent corrosion...) I have to admit, I have never had to take a dry transformer out of service due to degraded performance or anticipated failure- most of those I have had to replace have been killed by lightning...

In-service monitoring also proves critical- an overloaded transformer will let you know it is overworked through loud complaining and excessive heat- add more capacity before it cooks itself!

Register to Reply
Anonymous Poster
#2

Re: Dry transformer maintenance plan

12/20/2009 9:35 AM

u should do turn ratio too.

Register to Reply
Active Contributor

Join Date: Nov 2009
Posts: 14
#3
In reply to #2

Re: Dry transformer maintenance plan

12/28/2009 2:24 PM

but all producers ( Siemens, ABB, Sunbelt, another two - do not remember names) suggest only cleaning and bolts tightening. I do not fully happy with this short maintenance, but what will we get from having turn ratio ? and if do it - how offen ? how really effective this test for finding trouble within dry trafo ?

Register to Reply
Register to Reply 3 comments
Copy to Clipboard

Users who posted comments:

andreY (1); Anonymous Poster (1); cwarner7_11 (1)

Previous in Forum: Lacing secondary Cables   Next in Forum: 16sqmm cable

Advertisement