I am in the process of coming up with a method statement for installation of pre-fabricated flue stack parts. The challange is that this is a requirement that should accompany bid documents during tendering and no drawings have been supplied. I know the traditional approach of using a crane to install the lower portion and a combination of a crane for support(to prevent drags)with Tirfors/chainpullers for hoisting and positioning for bolting.
But, is there any other simpler way of doing this? The stack will have a height of 70meters when complete.
"Almost" Good Answers: