Concrete Test Results

09/05/2010 9:39 AM

Dear all,

can someone have simple detail regarding the results on concrete lest regarding pouring Lean Concrete.What is the limitation for evaluation and acceptance the sample of test's(cylinder, cubic...etc) especialy according to ACI and ASTIM Specifications...thanks

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

Good Answers:

These comments received enough positive votes to make them "good answers".
2
Associate

Join Date: Mar 2009
Location: Space Coast - Florida
Posts: 47
Good Answers: 3
#1

Re: Concrete Test Results

09/06/2010 8:58 AM

Need more information on what you need. Lean concrete is usually just used for 'flowable fill' and also to cap off construction temporarily until future work is designed or ready to be done. Placing lean concrete is easy to test in the field but the mix design by the Design Engineer is the telltale for the cyclinders will be stress tested at the lab and compared to the PSI designed.

__________________
Some drink at the fountain of Knowledge - others just gargle.
Register to Reply Good Answer (Score 2)
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#2

Re: Concrete Test Results

09/06/2010 3:33 PM

Concrete guideline

Hand troweling should be done in a way to avoid over-working the concrete lest

the steel trowels burn and discolor the concrete.

There are more concrete lests on the web.

Register to Reply
Guru

Join Date: Dec 2007
Location: California
Posts: 2363
Good Answers: 63
#3

Re: Concrete Test Results

09/07/2010 11:57 AM

Not really sure what the whole rest of discourse above is about, but as far as conformance the engineer will set the standards you test too. Typicaly ACI 318 and other ACI standards will be employed as reference in the US. If a concrete batch plant has enough recent test results data on a mix design, in some cases the mix design can be accepted with fewer in-field tests required. Testing is predominantly for structural concrete and for verification of compliance. If the concrete is not 3000 psi strength or greater (structural concrete), or the grout is not for a structural wall then testing is set by the architect/engineer based on need for compliance determination.

Register to Reply
Register to Reply 3 comments

Good Answers:

These comments received enough positive votes to make them "good answers".
Copy to Clipboard

Users who posted comments:

lyn (1); RCE (1); THE RPR (1)

Previous in Forum: Reconcilation of Steel   Next in Forum: Hydrostatic Testing For Waste Oil Tank

Advertisement