Anonymous Poster

Short Circuit Test

09/15/2010 9:24 AM

what is the procedure of short circuit test on busbar?
(procedure of the experiment)

Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Anonymous Poster
#1

Re: short circuit test

09/15/2010 9:41 AM
  1. Energise busbar
  2. Stand well back
  3. Cover eyes and face
  4. Drop short circuit device onto busbar
  5. Call ambulance/fire brigade as appropriate.
Reply Score 1 for Good Answer
Guru

Join Date: Oct 2009
Posts: 2061
Good Answers: 169
#2

Re: Short Circuit Test

09/15/2010 10:03 AM

But, why do you want to? Bus bar short circuit with stand test is normally a type test and it is done generally at recognised test houses like CPRI (in India), They only will have the infrastructure for conducting the test. Individual manufacturers or users will not have the necessary infrastructure.

Reply
Guru
United Kingdom - Member - New Member

Join Date: Aug 2010
Location: Resting under the Major Oak
Posts: 4347
Good Answers: 181
#3

Re: Short Circuit Test

09/15/2010 10:34 AM

GEC had a fantastic film of busbars under SC conditions. I'd love to see it done but from a very safe distance.

I've seen the aftermath of busbars failing due to overload. Extra loading was placed on an old slate panel, unfortunately the busbar insulators had been left at the original spacing. So it soon went from OL to SC.

__________________
The reports of my death are greatly exaggerated.
Reply
Commentator

Join Date: Feb 2010
Location: West Yorkshire, UK
Posts: 96
Good Answers: 11
#4

Re: Short Circuit Test

09/16/2010 8:42 AM

Procedure :-

1. Connect busbar system under test to test laboratory connections, having bolted a short circuit across the required test point. This link will usually be at least as large as the bars under test.

2. Laboratory staff will usually set up required current/voltage conditions in advance.

3. Close making switch onto test system

4. After required time (e.g. 1 second), open breaking switch (making and breaking switches are often separate for various reasons including timing accuracy). This is usually an automated sequence for obvious reasons. Record all measured values/oscillograms.

5. Let the system cool down, and carry out detailed inspections and flash tests to establish pass/fail.

6. Repeat as required, e.g. moving shorting link to other test points.

__________________
rogerggbr
Reply
Reply to Forum Thread 4 comments

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Copy to Clipboard

Users who posted comments:

Anonymous Poster (1); electricalexpert65 (1); rogerggbr (1); TonyS (1)

Previous in Forum: Contactor Coil Burnt   Next in Forum: Connecting a Relay
You might be interested in: Circuit Breakers, Busbars and Busways, Circuit Tracers

Advertisement