Previous in Forum: Diploma Thesis in Manufactory of Bolts   Next in Forum: Evaluating Surface Defects of Green Sand Cast Ductile
Close
Close
Close
Rate Comments: Nested
Member

Join Date: Jun 2010
Posts: 8

Holding Time for Hydro Test or Pressure Test

10/25/2010 3:35 AM

Dear sir,

I know that holding time for piping is 10 minutes as per the B 31.3 para. 345.2.2 (a) while conducting hydro test but could you explain me some one about the pressure vessel what is the holding time because I couldn't find any information from Sec VIII Div 1, UG-99.

Thank you,

Ilangkumaran

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru
Technical Fields - Technical Writing - New Member Engineering Fields - Piping Design Engineering - New Member

Join Date: May 2009
Location: Richland, WA, USA
Posts: 21017
Good Answers: 795
#1

Re: Holding Time for Hydro Test or Pressure Test

10/26/2010 1:30 AM

Until the inspector get tired of looking at it.

__________________
In vino veritas; in cervisia carmen; in aqua E. coli.
Register to Reply Off Topic (Score 5)
Register to Reply

Previous in Forum: Diploma Thesis in Manufactory of Bolts   Next in Forum: Evaluating Surface Defects of Green Sand Cast Ductile

Advertisement