Due to delay in availability of utility power, It is planned to do commissioning of the new plant I am working on with DG sets rented
The project is having 33 KV, 11KV, 6.6 KV and 415 volts voltage levels.
The DG power can be distributed to various unit (Air comp unit, DM plant, Auxiliary boiler, other utility and main plants) from 33KV or 11 KV SWGR centrally located.
Other voltage are plant/Unit level voltage requiring DGs at different locations.
The plan is to put DGs near power plant, running parallel and feeding 11KV SWGR. The power shall be received by different load centers/units at 11KV through permanent distribution arrangement.
Pl. Share your experience with DG rental service and any suggestion in this regard are welcome
Also suggest arrangement/reading/alternate to handle 4MVA of power generated from DG sets.