Dear sir's,
I need your help, to calculate the charging current of the underground cable to set the Line Differential Relay Points.
cable = 240 mm2 , XPLE/PVC/SWA
Runs = 4 runs each phase.
Volatge = 13.8 Kv
Ct ratio = 1000/5
Legth = 800 meter (directly burried).
Please can anyone provide me the formulae.
thanks in advace.