01/30/2011 1:41 AM

Please can i get help from CR4 experts to correct theses below given painting system which is given below and on more question developed is regarding the differentiating criteria between cyclic temperature condition and constant temperature condition for considering paint system P & Q.

PAINT SYSTEM

Base Material

TEMPERATURE

Surface Preparation

Primer

Intermediate

Finish

Total DFT

A

Un-insulated CSAmbient to 120

0C

Sa 2.5 (Rz= 50 - 75 µm)2-pack Epoxy zinc rich (organic zinc)2-pack Eoxy MIO2-pack acrylic polyurethane

275 µm

75 µm150 µm50 µm

B

Un-insulated CS121

0C to 200 0C

Sa 2.5 (Rz= 30 - 75 µm)2-pack ethyle zinc silicate (inorganic zinc)NASilicon acrylic coating

135 µm

75µm(30µm X 2) = 60 µm

C

Un-insulated CS201

0C to 400 0C

Sa 2.5 (Rz= 30 - 75 µm)2-pack ethyle zinc silicate (inorganic zinc)NASingle pack silicon coating

125 µm

75µm(25µm X 2) = 50 µm

D

Un-insulated CS401

0C to 540 0C

Sa 2.5 (Rz= 30 - 75 µm)Single pack silicon coatingNANA

50 µm

(25µm X 2) = 50 µm

P

Un-insulated CS Vessels and Cyclic temperature PipingAmbient to 400

0C

Sa 2.5 (Rz= 50 - 75 µm)Titanium Modified Inorganic Co-PolymerNANA

200 µm

(100µm X 2) = 200 µm

Q

Un-insulated CS Constant operating temperature PipingAmbient to 565

0C

Sa 2.5 (Rz= 50 - 75 µm)Titanium Modified Inorganic Co-PolymerNANA

175 µm

175 µm

E

Un-insulated SS(-196)

0 C to 200 0C

(Rz= 30 - 50 µm)2-pack epoxy phinolic primerNA2-pack epoxy phinolic finish

200 µm

100 µm100 µm

F

Un-Insulated / Non fireproofed Galvanized steelAmbient temp. (Rz= 30 - 50 µm) or mordant /etchning solution2-pack zinc free epoxyNA2-pack acrylic polyurethane

125 µm

75µm50 µm

K

Insulated CS Cryogenic servicesUp to (-4

0C)

Sa 2.5 (Rz= 50 - 75 µm)Epoxy phenolic primer2-pack Epoxy MIO2-pack acrylic polyurethane

500 µm to 600 µm

(300µm to 400µm)150 µm50 µm

L

Insulated CS Cryogenic services(-4)

0 C to lower temperature

Sa 2.5 (Rz= 50 - 75 µm)Silicon base primer (Hi-Temp 1027 Cryogenic type)2-pack Epoxy MIO2-pack acrylic polyurethane
150 µm50 µm

M

Insulated CSUp to 150

0C

Sa 2.5 (Rz= 50 - 75 µm)Epoxy phenolic primer or epoxy-novolac (Severe wet environment and critical process)2-pack Epoxy MIO2-pack acrylic polyurethane

500 µm to 600 µm / 600 µm to 700 µm

(300µm to 400µm) / (400µm to 500µm)150 µm50 µm

N

Insulated CSAbove 150

0C to 400 0C

Sa 2.5 (Rz= 30 - 75 µm)Silicon base primer (Hi-Temp 1027 or Thurmaloux 70)NASilicon acrylic coating
(30 µm X 2) = 60 µm

O

Insulated CSAbove 400

0C to 648 0C

Sa 2.5 (Rz= 30 - 75 µm)Silicon base primer (Hi-Temp 1027)NASingle pack Silicon based coating
(25µm X 2) = 50 µm

P

Insulated CS and SS Vessels and Cyclic temperature Piping(-196)

0 C to 400 0C

Sa 2.5 (Rz= 50 - 75 µm)Titanium Modified Inorganic Co-PolymerNANA

200 µm

(100µm X 2) = 200 µm

Q

Insulated CS and SS Constant operating temperature Piping(-165)

0 C to 565 0C

Sa 2.5 (Rz= 50 - 75 µm)Titanium Modified Inorganic Co-PolymerNANA

175 µm

175 µm

E

Insulated SS(-196)

0 C to 200 0C

(Rz= 30 - 50 µm)2-pack epoxy phinolic primerNA2-pack epoxy phinolic finish

200 µm

100 µm100 µm

G

Fireproofed (with concrete) Galvanized stractural steelAmbient temp. (Rz= 10 - 15 µm) or mordant /etchning solution2-pack poly amide epoxy (for touch of HDG)NANA

NA

H

Fireproofed (with concrete) Stractural Carbon steelAmbient temp.Sa 2.5 (Rz= 50 - 75 µm)2-pack poly amide epoxyNANA

75 µm

75 µm
Reply
User-tagged by 1 user
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.
Guru

Join Date: May 2010
Location: in optimism
Posts: 4050
Good Answers: 130
#1

Re: To be corrected the industrial coating system

01/30/2011 1:58 AM

Isn't this a duplicate?

__________________
There is no sin except stupidity. (Oscar Wilde, Irish dramatist, novelist, & poet (1854 - 1900))
Reply
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#3
In reply to #1

Re: To be corrected the industrial coating system

01/30/2011 3:31 AM

Isn't this homework?

Reply
Associate

Join Date: Nov 2009
Location: Kingdom of Saudi Arabia
Posts: 49
#2

Re: To be corrected the industrial coating system

01/30/2011 2:09 AM

You can't say it is duplicate but you can proceed if you want to incorporate something is wrong in given coating system with respect to service condition .....please

__________________
"Without goals you are like a ship that has set sail with no destination."
Reply
Associate

Join Date: Nov 2009
Location: Kingdom of Saudi Arabia
Posts: 49
#4

Re: To be corrected the industrial coating system

01/30/2011 3:54 AM

Actually this is a attachment of QCP and this QCP need to be approved by client, so i have forwarded to CR experts to correct these coating system prior to final submission. And i am not so expert to select the coating system with respect to service condition.

Thanks,

__________________
"Without goals you are like a ship that has set sail with no destination."
Reply
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#5
In reply to #4

Re: To be corrected the industrial coating system

01/30/2011 4:05 AM

What incentive would we have to do your work for you?

Reply
Guru
Hobbies - Fishing - New Member

Join Date: Jun 2008
Location: Raleigh, NC USA
Posts: 13529
Good Answers: 468
#6

Re: To be corrected the industrial coating system

01/30/2011 4:38 AM

Please send me a check for $50,000 US and a paint brush.

I'll be there on Thursday.

__________________
Those who would give up essential Liberty, to purchase a little temporary Safety, deserve neither Liberty nor Safety. Ben Franklin
Reply
Reply to Forum Thread 6 comments
Copy to Clipboard

Users who posted comments:

34point5 (1); Adeel Ahmad (2); kramarat (1); lyn (2)

Previous in Forum: Woodstove Humidity   Next in Forum: Water Evaporation

Advertisement