In our 330 mw turbine from baijing beizong steam turbine generator co.ltd. in that condenser 2 passes are there in the 1st pass heavy leakage came From sea water (cooling water) side. we want to isolate from 1st pass without trip the unit which isolation should be required (is it necessary to do isolation of vacuum pump to condenser line of isolating pass?).
"Almost" Good Answers: