Previous in Forum: Hume Pipe Culvert Design   Next in Forum: Help With This Engineering Question
Close
Close
Close
4 comments
Rate Comments: Nested
Participant

Join Date: Apr 2011
Posts: 3

SBR Design

04/13/2011 1:22 PM

I need to design a SBR domestic waste water plant with a peak plow of 0.75 m3/h. I dont know how to dimenion it, and i need some help. What are the times used for filling, aeration, settling, discarge for a domestic waste water? How are they chosen?How do I select the blower and air diffusers? How do i calculate how many diffusers I need? How should they be positioned for an uniform distribution? I have:

BOD5 - 1.8 kg zi

suspended solids 0.9 kg/zi

TKN 0.36 kg/zi

P 0.06 kg/zi

I m at the beginning with this and I really need help

Register to Reply
Interested in this topic? By joining CR4 you can "subscribe" to
this discussion and receive notification when new comments are added.

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Guru

Join Date: Oct 2008
Posts: 42355
Good Answers: 1693
#1

Re: SBR Design

04/13/2011 7:09 PM

The first link above is bogus. Here's the second (good) one.

Treatment Plant ...

Register to Reply Score 1 for Good Answer
Power-User
Engineering Fields - Civil Engineering - Member Engineering Fields - Construction Engineering - Member Engineering Fields - Mining Engineering - Member United States - Member - Member Popular Science - Weaponology - Member Hobbies - Target Shooting - Member Hobbies - Car Customizing - Member

Join Date: May 2008
Location: Cary, NC, USA
Posts: 131
Good Answers: 7
#2

Re: SBR Design

04/18/2011 10:26 AM

Your first step should be to contact a good engineer that has a history of designing this type of plant.

__________________
You cannot escape the responsibility of tomorrow by evading it today - Abraham Lincoln
Register to Reply
Participant

Join Date: Apr 2011
Posts: 3
#3
In reply to #2

Re: SBR Design

04/18/2011 12:58 PM

Here aren't engineers for something like this. I have to do it by myself, it is the only chance I got. Thanks.

Register to Reply
Participant

Join Date: Apr 2011
Posts: 3
#4

Re: SBR Design

04/18/2011 1:00 PM

Thanks, those are really helping me ou

Register to Reply
Register to Reply 4 comments

"Almost" Good Answers:

Check out these comments that don't yet have enough votes to be "official" good answers and, if you agree with them, vote them!
Copy to Clipboard

Users who posted comments:

iulia (2); lyn (1); Old Coal Man (1)

Previous in Forum: Hume Pipe Culvert Design   Next in Forum: Help With This Engineering Question

Advertisement