There is a STB power Supply no-automatic test which has just 7 second warming time.
I have been asked to change the 7 second warming time to 5 minutes burning time before to perform volt-amp measurement.
I am thinking to use a 5491B true rms bench multimeter from B&K for volt and current measurement which is very expensive compared to the actual equipment (somewhere home made).
In this case I would like to set up a semiautomatic test in which operator will be able to test more than one STB power supply in order to compensate the 4:53 minutes difference.
I think in a commercial switch available somewhere, which I still do not know, which allow me to use a micro controller or a PC to make the switching from one power supply to another. I would like not to loose time designing one.
Somebody would like to recommend to me one.
"Almost" Good Answers: